SE RVICING A ND INSPEC TION
148
First inspection after 50 operating hours
Tasks to be performed (check) 50 hours inspection
Check the transmission, engine and hydraulic system for leaks
Check the hydraulic, engine coolant and engine oil coolers for dirt
Check the coolant level and antifreeze
Check the tension and condition of the V-belt
Make sure all hoses and pipes fit tightly
Check the routing of the hoses and pipes
Check the piston rods for the hydraulic cylinders for damage or dirt
Check the routing of the bowden cables and electrical wiring
Retighten all the fasteners. Observe in particular the engine suspension, axle mounting and drive shaft
Check: Instr audible warning devices
Maintenance and inspection personnel must have
specialized knowledge of servicing and inspection
work on the loader.
Follow the Operator’s Manual for the engine.
To assure proper functioning of the machine, it is
required that the first inspection be performed after
50 operating hours, but at the latest 3 months after
initial start-up, by a Wacker Neuson dealer or a
mechanic at a Wacker Neuson factory agent.
Содержание WL 50
Страница 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Страница 2: ...December 08 Edition...
Страница 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Страница 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Страница 123: ...Operating and operation 121 WL50...
Страница 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Страница 169: ...SERVICING AND INSPECTION 167 WL50 Fig 72 Position of the cab mounting bolts Fig 73 Tilting the cab 1 2 3...
Страница 243: ...Appendix 241 WL50 For personal notes...
Страница 253: ...List of figures 251 WL50...