![Wacker Neuson WL 50 Скачать руководство пользователя страница 157](http://html1.mh-extra.com/html/wacker-neuson/wl-50/wl-50_operators-manual_3112259157.webp)
SE RVICING A ND INSPEC TION
155
W L 50
Work to be performed
Operating hours:
250, 750, 1000,
1250, 1750,
2000, 2250,
2750, 3000, etc.
Operating
hours: 1500,
2500, 3500,
4500, etc.
monthly
annually
Check the lighting system – (if present)
x
x
x
x
Check the exhaust system
x
x
Check the hinge pins and joint bushings
x
x
Check the center pivot bolts and bearings
x
x
Check the pressure relief valves in the hydraulic system
x
x
Check the idle speed
x
x
x
x
Check max. speed when loaded and unloaded
x
x
Check the starter and alternator (engine manual)
x
x
Check the heater plugs and fuel injectors (engine manual)
x
x
Check the valve clearance, adjust if necessary
x
For Deutz engines: Check the timing belt for engine timing and, if avail-
able, for auxiliary drive system (do not retighten, change every 5 years or
after 4500 op. hours)
x
x
Check the fuel injectors (every 3000 operating hours)
Check the functioning of the engine enclosure locking mechanism, adjust
if necessary
x
x
x
x
Содержание WL 50
Страница 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Страница 2: ...December 08 Edition...
Страница 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Страница 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Страница 123: ...Operating and operation 121 WL50...
Страница 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Страница 169: ...SERVICING AND INSPECTION 167 WL50 Fig 72 Position of the cab mounting bolts Fig 73 Tilting the cab 1 2 3...
Страница 243: ...Appendix 241 WL50 For personal notes...
Страница 253: ...List of figures 251 WL50...