BASIC SA FET Y INSTRUC TIONS
17
W L 50
Selection and qualification of personnel / basic duties
2.2
Personnel being trained, educated, instructed or partici-
•
pating in a general training program may only work on
or with the machine under constant supervision of an
experienced, authorized supervisor.
Work on the machine‘s electrical equipment may only be
•
performed by an electrician or by trained persons under
the direction and supervision of an electrician.
Work on the chassis, brakes and steering system may
•
only be performed by trained, specialized personnel.
Only trained, specialized personnel with specific knowl-
•
edge of and experience in hydraulics may work on hy-
draulic units.
The operator of the wheel loader must be qualified to
•
operate the machine through demonstration of com-
prehension of the operating instructions. No one shall
operate the wheel loader if impaired due to intoxication
or drug reaction.
Diagnosis and repair of the wheel loader shall be per-
•
formed by trained competent technicians unimpaired by
intoxication or drug reaction.
Prohibit unauthorized and untrained people from access
•
to the starting key and operation of the wheel loader.
The wheel loader operator is responsible for visually
•
monitoring the work area of the wheel loader and pre-
venting anyone from entering the area without permis-
sion. If a person enters the area while the wheel loader
is in operation, the operator shall stop the wheel loader
and instruct the person to leave the work area until the
wheel loader has been stopped in a safe mode. The
person may then approach the machine in full view of
the operator.
Содержание WL 50
Страница 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Страница 2: ...December 08 Edition...
Страница 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Страница 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Страница 123: ...Operating and operation 121 WL50...
Страница 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Страница 169: ...SERVICING AND INSPECTION 167 WL50 Fig 72 Position of the cab mounting bolts Fig 73 Tilting the cab 1 2 3...
Страница 243: ...Appendix 241 WL50 For personal notes...
Страница 253: ...List of figures 251 WL50...