Pivoting down the control unit for commissioning and main-
tenance work
1.
Open flap
A
.
2.
Turn both screws
B
down.
3.
Release the side closures
C
and
pivot control unit
D
forward.
4.
Release the side screws and pivot
control unit
D
down with its retain-
ing frame
E
.
Further details regarding the individual steps
(cont.)
13
Commissioning, inspection, maintenance
5692
779