Then standard control mode
resumes.
2.
Note the rotational direction of the
mixer motor during its self-test.
Then set the mixer manually to
"Open" again.
Note
The flow temperature sensor must
now capture a higher temperature.
If the temperature drops, either the
motor is turning in the wrong direc-
tion or the mixer set is incorrectly
fitted.
Mixer installation instruc-
tions
Changing the rotational direction of the mixer motor (if required)
Danger
An electric shock can be life-threatening.
Before opening the equipment, switch OFF the ON/OFF switch and
mains voltage, for example at the fuse or the main isolator.
A
ON/OFF switch
B
Rotational direction switch
1.
Remove the lower and upper hous-
ing cover of the extension kit.
Extension kit installation
instructions
Repairs
(cont.)
80
Troubleshooting
5692
779
GB
Содержание VITOLADENS333-F
Страница 96: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 96 Designs 5692 779 GB...
Страница 101: ...Parts lists cont 101 Parts lists 5692 779 GB...
Страница 102: ...Parts lists cont 102 Parts lists 5692 779 GB...
Страница 103: ...Parts lists cont 103 Parts lists 5692 779 GB...
Страница 104: ...Parts lists cont 104 Parts lists 5692 779 GB...
Страница 105: ...Parts lists cont 105 Parts lists 5692 779 GB...