For further details regarding faults,
see page 75.
Checking the static and supply pressure
Danger
CO build-up as a result of an incorrect burner setup can have serious
health implications.
Carry out a CO test prior to and after work on gas equipment.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Thoroughly vent
the tank and gas supply lines after flushing.
1.
Close the gas shut-off valve.
2.
Release screw
A
inside test con-
nector "PE" on the gas train, but do
not remove it; then connect the
pressure gauge.
3.
Open the gas shut-off valve.
4.
Measure the static pressure and
record it in the service report on
page 129.
Set value: max. 57.5 mbar
5.
Start the boiler.
Note
During commissioning, the boiler
can enter a fault state because of
airlocks in the gas pipe. After
approx. 5 s press "
E
RESET" to
reset the burner.
6.
Check the supply (flow) pressure.
Set value:
&
Natural gas: 20 mbar
&
LPG: 50 mbar
Note
Use suitable test equipment with a
resolution of at least 0.1 mbar to
measure the supply pressure.
Further details regarding the individual steps
(cont.)
17
Commissioning, inspection, maintenance
56
92
682
GB
Содержание Vitodens 333-F
Страница 5: ...Keyword index 133 Index cont 5 Index 5692 682 GB ...
Страница 119: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 119 Designs 5692 682 GB ...
Страница 123: ...Parts lists cont 123 Parts lists 5692 682 GB ...
Страница 124: ...Parts lists cont 124 Parts lists 5692 682 GB ...
Страница 125: ...Parts lists cont 125 Parts lists 5692 682 GB ...
Страница 126: ...Parts lists cont 126 Parts lists 5692 682 GB ...
Страница 127: ...Parts lists cont 127 Parts lists 5692 682 GB ...
Страница 128: ...Parts lists cont 128 Parts lists 5692 682 GB ...
Страница 135: ...Keyword index cont 135 Keyword index 5692 682 GB ...