For balanced flue systems tested
together with the wall mounted gas
fired boiler, the requirement for a
tightness test during commissioning
by the flue gas inspector is not applic-
able.
We recommend that your heating
engineer carries out a simple leak/
tightness test during the commission-
ing of your system. For this, it would
be sufficient to check the CO
2
or O
2
concentration in the combustion air at
the annular gap of the balanced flue
pipe.
The flue pipe is deemed to be gas-
tight if the CO
2
concentration in the
combustion air is no higher than 0.2 %
or the O
2
concentration is at least
20.6 %.
If actual CO
2
values are higher or O
2
values are lower, then pressure test
the flue pipe with a static pressure of
200 Pa.
Further details regarding the individual steps
(cont.)
20
Commissioning, inspection, maintenance
56
92
682
GB
Содержание Vitodens 333-F
Страница 5: ...Keyword index 133 Index cont 5 Index 5692 682 GB ...
Страница 119: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 119 Designs 5692 682 GB ...
Страница 123: ...Parts lists cont 123 Parts lists 5692 682 GB ...
Страница 124: ...Parts lists cont 124 Parts lists 5692 682 GB ...
Страница 125: ...Parts lists cont 125 Parts lists 5692 682 GB ...
Страница 126: ...Parts lists cont 126 Parts lists 5692 682 GB ...
Страница 127: ...Parts lists cont 127 Parts lists 5692 682 GB ...
Страница 128: ...Parts lists cont 128 Parts lists 5692 682 GB ...
Страница 135: ...Keyword index cont 135 Keyword index 5692 682 GB ...