![Vertiv NetSure 2100 Series Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/vertiv/netsure-2100-series/netsure-2100-series_installation-manual_1008094065.webp)
Vertiv
|
NetSure™ 2100 Series -48 VDC Power System Installation Manual (IM582138000)
|
Rev. C
65
Figure 37:
Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring (Lists BA) (cont’d on next
page)
Observe proper polarity
when making battery
and load connections.
WARNING!
Battery, Battery Return, CO Ground:
1/4-20 studs on 5/8” centers for
installation of customer provided
two-hole lugs.
Maximum Lug Width: 0.6 inches.
Hardware:
1/4-20 Hex Nut
1/4" Lock Washer
1/4" Flat Washer
Torque to 58 in-lbs.
-48 VDC
SUPPLY
GND RTN
C
ent
ral
O
ffi
ce G
roun
d
Bat
ter
y R
et
ur
n B
us
Bat
ter
y B
us
Rear
Remove top rear shield to
access connection points.
Shown in illustration
lifted above shelf.
Distribution Wire
Routing Channel