7
20307394
4" x 6
5
⁄
8
" SLP Termination Kit
KT1497
horizontal term kit
SLP-RVTK, SLP-RVTM, SLP-HVTK -
HORIZONTAL TERMINATION KIT
Installation Instructions
Figure 11
BLDV REQUIRED:
Attach 12" (305 mm) fixed-length
pipe to the pipe connector.
SLP-HVTK:
Attach the 90° elbow to the pipe connector
(or 12" pipe). Nest the indentations on the female end of
the 90° elbow into the slots of the pipe connector (or 12"
pipe) and twist the pipe together.
SLP-RVTK, SLP-RVTM:
Attach the adjustable pipe to
the pipe connector (or elbow).
Nest the indentations on the female end of the adjustable
pipe into the slots of the pipe connector (or elbow) and
twist the pipe together.
Cut-to-Length
Pipe
Firestop
Fireplace
Termination Cap
KT1497
horizontal term kit
90° Elbow
Adjustable Pipe
Firestop
Termination
Cap
Fireplace
SLP-HVTK
BLDV must use 12"
fixed-length pipe,
installed before the
90° elbow
Figure 11 - Installation of Horizontal Termination Kit
SLP-RVTM
SLP-RVTK, SLP-RVTM, SLP-HVTK:
During shipping, the SLP6A is slid over the SLP6 to make
an adjustable pipe. In some installations, you may want
to use only the SLP6 (for instances in which the adjustable
pipe is too long for installation.) Otherwise, adjust pipe to
desired length.
A wall square firestop
MUST BE
installed if the vent passes
through a ceiling or exterior combustible wall. Cut a 9"
wide x 9" high (229 x 229 mm) opening through the wall
or framing. A wall rectangular firestop
MUST BE
installed
if the vent passes through interior walls. In that case, cut
a 10" wide x 10" high (254 x 254 mm) opening through
the wall or framing. The framing members may need to be
reinforced. Position the firestop on the hole previously cut
and secure with screws or nails (not provided). Run vent
pipe through firestop. The gap between the vent pipe and
the firestop may be sealed.
Attach slip section of cap to last vent section. Maintain
1
1
⁄
2
in. overlap between slip and vent sections. Make sure
the termination cap is installed with the embossed arrow
pointing up.
If the house has vinyl siding, mark and cut the vinyl siding
around the pipe so the termination cap can be mounted
flush to the wall. Finish the siding edges with trim or “J
channel" and caulking to prevent water from leaking into
the building.
Figure 12
Attach the termination cap to the exterior wall using the
four (4) screws provided.
SLP-20TPM
NOTE: You may use the SLP-RVTM for corner
installations. You may also use the SLP-RVTM off
the rear of the unit with a 45° elbow (p/n SLP45)
and proper length of pipe(s). Refer to appropriate
venting charts in appliance installation manual.
SLP-RVTM cap uses
adjustable pipe instead
of cut-to-length.
KT1498
cap on sidingT
Cutout On Vinyl
Vinyl Siding Wall
Termination Cap
Figure 12 - Horizontal Termination Cap on a Vinyl Siding Wall