3
20307394
4" x 6
5
⁄
8
" SLP Termination Kit
Attach the First Vent Component to SLP Starting
Collars
To attach the first vent component to the starting collars
of the appliance:
•
Lock the vent components into place by sliding the
pipe section onto the collar.
Align the seam of the pipe and seam of collar to allow
engagement. Rotate the vent component to lock into place.
Use this procedure for all vent components (See Figure 2).
• Continue adding vent components, locking each suc
-
ceeding component into place.
•
Ensure that each succeeding vent component is se-
curely fitted and locked into the preceding component.
NOTE:
The end of the pipe sections with the lances/
tabs on it will face toward the appliance.
Commercial or High-rise Applications
For installation into a commercial or high-rise application:
• All outer pipe joints must be sealed with high tempera
-
ture aluminum foil tape, including the slip section that
connects directly to the horizontal termination cap.
•
Only outer pipes are to be sealed. Do not seal the in-
ner flue. All unit collar, pipe, slip section, elbow and
cap outer flues shall be sealed in this manner, unless
otherwise stated.
1 - Align Seams
2 - Rotate
Figure 2 - Adding Venting Components
PRE-INSTALLATION INFORMATION
ATTENTION
For use on VCG fireplaces certified to ANSI Z21.50/CSA
2.22 and ANSI Z21.88/CSA 2.33 standards.
ATTENTION
The vent kits described in this manual are tested as part
of a system certified to CSA/ANSI standards to work
with SLP vent lengths certified by UL/ULC and SLP
termination vent kits approved by CSA.