6
20307394
4" x 6
5
⁄
8
" SLP Termination Kit
Divert Roof Run-off
VCG/HHT recommends, where excessive water run-off is
possible, use of one of the two options shown in Figure
10 to prevent water running off the roof and onto/into the
horizontal termination cap.
Install gutter
Install L-shaped
diverter
Figure 10 - Divert Roof Run-off
HORIZONTAL TERMINATION CAP
WARNING
Risk of Fire! The telescoping flue section of the
termination cap MUST be used when connecting vent.
• 1
1
⁄
2
” (38 mm) minimum overlap of vent and tele-
scoping flue section is required.
Failure to maintain overlap may cause overheating and
fire.
NOTE: For horizontal vent runs through a
combustible wall and framing dimensions, refer
to appliance installation manual.
Install the Horizontal Termination Cap
Attach slip section of cap to last vent section. Maintain 1
1
⁄
2
"
overlap between slip and vent sections.
NOTE
: For installations using black pipe, slide
the decorative wall thimble over the last vent pipe
before connecting the termination to the pipe.
When this connection has been made, slide the wall
thimble up to the interior wall surface and attach
with screws provided.
Secure termination cap to exterior wall using provided
holes and fasteners.
Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
CAUTION
Risk of Burns! Local codes may require installation of a
termination guard to prevent anything or anyone from
touching the hot cap.
Flash and seal as appropriate for siding material at outside
edges of cap.
When installing a horizontal termination cap, follow the cap
location guidelines as prescribed by current
ANSI Z223.1
and
CAN/CGA-B149
installation codes.