10-11
10
Pressurized Line Leak Detection
Mechanical Blenders
Offset value, then ENTER to confirm the change. Repeat this procedure until you have entered Offsets for all
transducers.
Mechanical Blenders
When a site has mechanical blenders, the lines can be assigned to a blend set. This change affects the scheduling
of precision line testing, 0.2 and 0.1.
Press STEP until you see the message:
Press CHANGE:
Press ENTER.
Before proceeding to Blend Partners, enable Mechanical Blender for all lines:
Press CHANGE:
Press ENTER.
Setting Up Additional PLLDs
If you have additional PLLDs to set up, press STEP to return to the PRESSURE LINE LABEL message:
Press TANK/SENSOR to access another PLLD. Repeat the steps described above, beginning with “Labeling
PLLDs” on page 10-1. After you have entered setup information for all PLLDs in the system, press FUNCTION to
exit.
Q 1: PLLD NUMBER 1
MECHANICAL BLENDER: NO
Q 1: PLLD NUMBER 1
MECHANICAL BLENDER: YES
Q 1: BLEND PARTNERS
Q#: 00, 00
Q 1: BLEND PARTNERS
Q#: 02, 03
PRESSURE LINE LABEL
Q1: