Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), RS485
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel ++41 81 771 61 61 Fax ++41 81 771 48 30 Email
www.vatvalve.com
271149EA
2007-06-12
7/77
2 Installation
2.1 Unpacking
As this valve is a heavy component you should lift it with adequate equipment to prevent any injury to
humans.
Valves DN200 (8”) and larger are equipped with attachment points (tapped holes). Add eyebolts to
these attachment points for lifting. The attachment points are indicated on the dimensional drawing of
the specific valve part number (available on request).
Never lay the valve down with control and actuating unit downwards as it may be damaged.
2.2 Installation into the system
Fingers and objects must be kept out of the valve opening and away from moving parts.
The valve plate may start to move just after power is supplied.
Do not connect or disconnect sensor cable when device is under power.
1. Install valves [1] into the vacuum system. Valve seat side should face process chamber. The valve seat side is
indicated by the symbol "
∇
" on the valve flange.
Caution: Do not tighten the flange screws stronger than indicated under «Tightening torque».
Caution: Do not admit higher forces to the valve than indicated under «Admissible forces».
Note: Make sure that enough space is kept free to do preventive maintenance work. The required space is indicated
on the dimensional drawing.
Master
Slave
[6] Link cable
[6] Link to next Slave