Mounting
Radar Tank Gauge
12
Installation and Operations Manual
3.2
Incoming acceptance, transport, storage
3.2.1
Incoming acceptance
Check the packing and contents for any signs of damage.
Check the shipment, make sure nothing is missing and that the scope of supply matches
your order.
3.2.2
Transport
Caution!
Follow the safety instructions and transport conditions for instruments of more than
18 kg. Do not lift the measuring instrument by its housing in order to transport it.
3.2.3
Storage
Pack the measuring instrument so that is protected against impacts for storage and
transport. The original packing material provides the optimum protection for this.
The permissible storage temperature is -40 °C…+80 °C.
Содержание 7532
Страница 21: ...21 7532 Mounting Preparation for the installation of the Varec UNI flange R532xx 00 00 06 en 002...
Страница 31: ...31 7532 Operation 5 Operation 5 1 Quick operation guide...
Страница 44: ...Operation Radar Tank Gauge 44 Installation and Operations Manual...
Страница 46: ...Commissioning Radar Tank Gauge 46 Installation and Operations Manual 6 3 Basic Setup...
Страница 72: ...Commissioning Radar Tank Gauge 72 Installation and Operations Manual...
Страница 74: ...Maintenance Radar Tank Gauge 74 Installation and Operations Manual...
Страница 76: ...Accessories Radar Tank Gauge 76 Installation and Operations Manual...
Страница 77: ...77 7532 Troubleshooting 9 Troubleshooting 9 1 Troubleshooting instructions...
Страница 91: ...91 7532 Appendix 11 Appendix 11 1 Operating menu HART Display modul ToF Tool...
Страница 94: ...Appendix Radar Tank Gauge 94 Installation and Operations Manual 11 2 Operating matrix HART Commuwin II...
Страница 105: ...7532 IOM027FVAE0804 105 Notes...