Commissioning
Radar Tank Gauge
48
Installation and Operations Manual
To successfully commission a precise measurement to the nearest mm, it is important
you carry out a
history reset
on
first installation
after mechanical installation and
after
the basic setup of the device (see Page 56). Only after a history reset the
mounting cali-
bration
is carried out. Enter the measurement
offset
as the first point in the dip table for
the mounting calibration. When a value is dipped at a later date, make a second entry
into the dip table, again using the semi-automatic mode. This way, you can easily carry
out a
linearization
of the measurement.
When configuring the function in "
basic setup
"
(00)
please take into account the
following notes:
• Select the functions as described on page 31.
• Some functions can only be used depending on the parameterization of the
instrument. For example, the pipe diameter of a stilling well can only be entered if
"stilling well"
was selected beforehand
in the "
tank shape
"
(002)
function.
• Certain functions (e.g. starting an interference echo mapping (053)) prompt you to
confirm your data entries. Press
O
or
S
to select "
YES
" and press
F
to confirm. The
function is now started.
• If you do not press a key during a configurable time period (
→
function group
"display (09)"), an automatic return is made to the home position (measured value
display).
Note!
• The instrument continues to measure while data entry is in progress, i.e. the current
measured values are output via the signal outputs in the normal way.
• If the envelope curve mode is active on the display, the measured values are updated
in a slower cycle time. Thus, it is advisable to leave the envelope curve mode after the
measuring point has been optimized.
• If the power supply fails, all preset and parameterized values remain safely stored in
the EEPROM.
Note!
All functions are described in detail, as is the overview of the operating menu itself, in
the 7500 RTG "Service manual and description of instrument functions".
Содержание 7532
Страница 21: ...21 7532 Mounting Preparation for the installation of the Varec UNI flange R532xx 00 00 06 en 002...
Страница 31: ...31 7532 Operation 5 Operation 5 1 Quick operation guide...
Страница 44: ...Operation Radar Tank Gauge 44 Installation and Operations Manual...
Страница 46: ...Commissioning Radar Tank Gauge 46 Installation and Operations Manual 6 3 Basic Setup...
Страница 72: ...Commissioning Radar Tank Gauge 72 Installation and Operations Manual...
Страница 74: ...Maintenance Radar Tank Gauge 74 Installation and Operations Manual...
Страница 76: ...Accessories Radar Tank Gauge 76 Installation and Operations Manual...
Страница 77: ...77 7532 Troubleshooting 9 Troubleshooting 9 1 Troubleshooting instructions...
Страница 91: ...91 7532 Appendix 11 Appendix 11 1 Operating menu HART Display modul ToF Tool...
Страница 94: ...Appendix Radar Tank Gauge 94 Installation and Operations Manual 11 2 Operating matrix HART Commuwin II...
Страница 105: ...7532 IOM027FVAE0804 105 Notes...