45
7532
Commissioning
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring
point:
• Checklist “Post installation check” (see page 24).
• Checklist “Post connection check” (see page 30).
6.2
Commissioning
6.2.1
Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear on
the display:
⇒
⇓
After 5 s, the following message appears
⇓
After 5 s or after you have pressed
F
the follow-
ing message appears
Select the language
(this message appears the first time the instrument
is switched on)
⇓
Select the basic unit
(this message appears the first time the instrument
is switched on)
⇓
The current measured value is displayed
⇓
After
F
is pressed, you reach the group selection.
This selection enables you to perform the basic
setup
E
+
–
Содержание 7532
Страница 21: ...21 7532 Mounting Preparation for the installation of the Varec UNI flange R532xx 00 00 06 en 002...
Страница 31: ...31 7532 Operation 5 Operation 5 1 Quick operation guide...
Страница 44: ...Operation Radar Tank Gauge 44 Installation and Operations Manual...
Страница 46: ...Commissioning Radar Tank Gauge 46 Installation and Operations Manual 6 3 Basic Setup...
Страница 72: ...Commissioning Radar Tank Gauge 72 Installation and Operations Manual...
Страница 74: ...Maintenance Radar Tank Gauge 74 Installation and Operations Manual...
Страница 76: ...Accessories Radar Tank Gauge 76 Installation and Operations Manual...
Страница 77: ...77 7532 Troubleshooting 9 Troubleshooting 9 1 Troubleshooting instructions...
Страница 91: ...91 7532 Appendix 11 Appendix 11 1 Operating menu HART Display modul ToF Tool...
Страница 94: ...Appendix Radar Tank Gauge 94 Installation and Operations Manual 11 2 Operating matrix HART Commuwin II...
Страница 105: ...7532 IOM027FVAE0804 105 Notes...