Identification
Radar Tank Gauge
10
Installation and Operations Manual
2.2
Scope of delivery
Caution!
It is essential to follow the instructions concerning the unpacking, transport and storage
of measuring instruments given in the section “Incoming acceptance, transport, storage”
on page 12.
The scope of delivery consists of:
• Assembled instrument
• ToF Tool (operating program)
• Accessories (Chapter 8)
Accompanying documentation:
• Short manual (basic equalization/troubleshooting): housed in the instrument
• Operating manual (this manual)
• Operating manual: Description of the instrument functions
• Approval documentation: if this is not included in the operating manual.
2.3
Certificates and approvals
CE mark, declaration of conformity
The instrument is designed to meet state-of-the-art safety requirements, has been
tested and left the factory in a condition in which it is safe to operate. The instrument
complies with the applicable standards and regulations in accordance with EN 61010
“Protection Measures for Electrical Equipment for Measurement, Control, Regulation and
Laboratory Procedures”. The instrument described in this manual thus complies with the
statutory requirements of the EG directives. Varec confirms the successful testing of the
instrument by affixing to it the CE mark.
2.4
Registered trademarks
KALREZ
®
, VITON
®
, TEFLON
®
Registered trademark of the company E.I. Du Pont de Nemours & Co., Wilmington, USA
TRI-CLAMP
®
Registered trademark of the company Ladish & Co., Inc., Kenosha, USA
HART
®
Registered trademark of HART Communication Foundation, Austin, USA
ToF
®
Registered trademark of the company Hauser GmbH+Co. KG, Maulburg, Ger-
many
PulseMaster
®
Registered trademark of the company Hauser GmbH+Co. KG, Maulburg, Ger-
many
PhaseMaster
®
Registered trademark of the company Hauser GmbH+Co. KG, Maulburg, Ger-
many
Содержание 7532
Страница 21: ...21 7532 Mounting Preparation for the installation of the Varec UNI flange R532xx 00 00 06 en 002...
Страница 31: ...31 7532 Operation 5 Operation 5 1 Quick operation guide...
Страница 44: ...Operation Radar Tank Gauge 44 Installation and Operations Manual...
Страница 46: ...Commissioning Radar Tank Gauge 46 Installation and Operations Manual 6 3 Basic Setup...
Страница 72: ...Commissioning Radar Tank Gauge 72 Installation and Operations Manual...
Страница 74: ...Maintenance Radar Tank Gauge 74 Installation and Operations Manual...
Страница 76: ...Accessories Radar Tank Gauge 76 Installation and Operations Manual...
Страница 77: ...77 7532 Troubleshooting 9 Troubleshooting 9 1 Troubleshooting instructions...
Страница 91: ...91 7532 Appendix 11 Appendix 11 1 Operating menu HART Display modul ToF Tool...
Страница 94: ...Appendix Radar Tank Gauge 94 Installation and Operations Manual 11 2 Operating matrix HART Commuwin II...
Страница 105: ...7532 IOM027FVAE0804 105 Notes...