COMMISSIONING
71
Step 4
Assembly steps:
1. Insert the three hangers into the funnel holes (1)
and slide the funnel onto the conductor rail sec-
tion.
Step 5
Assembly steps:
1. Attach the transfer funnel to the retaining plate
using the VKS hangers.
Step 6
Required tools:
⚒
Screwdriver
Assembly steps:
1. Secure the hangers using the fixed point screws.
Step 7
Assembly steps:
1. Align the funnel unit accurately with the auxiliary
support and fasten it.
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...