COMMISSIONING
73
6.5.5
Path measuring systems
APOS
See separate installation instructions
WCS laminate code rail
Step 1
Assembly steps:
1. Insert the plastic laminate tape into the groove
(1) of the insulation profile.
2. Connect the insulation profile with the plastic
laminate tape using the spring steel mounting
brackets.
NOTICE!
►
Ensure that the bracket engages first in the
groove (1).
3. Fix the laminate tape in the middle of each con-
ductor rail section with a screw.
NOTICE!
►
The mounting distance is 200 mm (6.6 x 30 mm
slot in the laminate every 200 mm)
Grounding of the code rail
The laminate rail must be connected to the system potential at least every 30 m (e.g. via Vahle support profile).
Bar code strip
In addition to the path measuring system, the self-adhesive bar code tape (BCB) can also be attached to the
bar.
NOTICE!
►
Check the surface: It must be smooth, dry and
free of grease and dust.
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...