![Vahle VKS10 Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/vahle/vks10/vks10_translation-of-the-original-instructions_848504032.webp)
LAYOUT AND FUNCTION
30
4.3.10
Double line guide
The double line guide is fastened to a section in the transverse lane. It is aligned together with the current col-
lectors on the storage and retrieval system.
Double line guide
for current collector
KSTU 30-63
Speed, max. V [m/min] 100
Cu cross section [mm
2
] min. 25
Guide bars
Plastic
Attachment material
Galvanized steel
Tolerances [mm] x = ± 10
y = + 8 / - 7
Type
Weight [kg]
Dimension A
Number of poles
ID no.
SE-DSEV10-4-KSTU30/63
1.888
56.5
4
781 453
SE-DSEV10-5-KSTU30/63
1.884
70.5
5
781 452
SE-DSEV10-6-KSTU30/63
1.880
84.5
6
780 168
SE-DSEV10-7-KSTU30/63
1.876
98.5
7
780 167
SE-DSEV10-8-KSTU30/63
1.872
112.5
8
780 166
SE-DSEV10-9-KSTU30/63
1.868
126.5
9
780 165
SE-DSEV10-10-KSTU30/63 1.575
140.5
10
780 164
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...