COMMISSIONING
72
Double line guide
The double line guide consists of an upper and a lower guide bar which is screwed to a conductor rail/support
profile section in the head lane.
Step 1
Assembly steps:
1. During installation, align the double line guide
with the current collector on the storage and re-
trieval system.
2. Glue in the PVC bars in the area of the line
guides.
NOTICE!
►
Do not mount VKS10 hangers and VTP10 hangers/connectors in the area of the line guide. See the cor-
responding installation plan for specific installation situations.
TIPS AND RECOMMENDATIONS!
It is recommended to create a reference lane using a
reference device. Afterwards all
lanes must be approached with this reference device. All current collector packages
must then be aligned with the
reference device. This ensures that all storage and re-
trieval systems can approach all lanes.
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...