![Vahle VKS10 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/vahle/vks10/vks10_translation-of-the-original-instructions_848504021.webp)
LAYOUT AND FUNCTION
19
Pin allocation
(1)
Conductor rails connected in parallel.
VKS10-4/
63-140
VKS10-5/
63-140
VKS10-6/
63-140
VKS10-7/
63-140
VKS10-8/
63-140
VKS10-9/
63-140
VKS10-9/
200-
280
(1)
VKS10-
10/63-
140
VKS10-
10/200-
280a
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L3
PE
PE
PE
PE
PE
PE
PE
PE
PE
Free
5
5
5
5
5
L1
5
L1
Free
Free
6
6
6
6
L2
6
L2
Free
Free
Free
7
7
7
L3
7
L3
Free
Free
Free
Free
8
8
8
8
8
Free
Free
Free
Free
Free
9
9
9
9
Free
Free
Free
Free
Free
Free
Free
10
10
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...