![Vahle VKS10 Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/vahle/vks10/vks10_translation-of-the-original-instructions_848504081.webp)
MAINTENANCE
79
8.2
Contact line
For normal use, the conductor system requires only little maintenance. The following tasks should be per-
formed periodically however.
In case of damage to the conductor system, the associated components such as current collectors must be
inspected for damage.
Replacing the conductor system
Usually, the wear of the conductor system cannot be measured. If maintenance intervals are kept, then life-
times of 15-20 years and more can be achieved.
Interval
Service/monitoring
Personnel
daily
• Check safety equipment and operating behavior.
Operator
monthly
• Visual inspection of general condition. Replace damaged/de-
fective parts.
• Check mechanical and electrical connections, especially at the
feed terminals; re-tighten if necessary.
• Remove small burns or discolorations on the contact surface by
scouring with an abrasive pad (min. grit size 400). Do not use a
powered brush. If removing the burns is not possible, then re-
place the relevant section of the conductor system.
Technician/electrical-
ly qualified person
quarterly
• Vacuum off any dust deposits (e.g. from graphite contacts) and
other particles. Cleaning acc. to section 3.4.
Qualified persons
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...