![Vahle VKS10 Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/vahle/vks10/vks10_translation-of-the-original-instructions_848504018.webp)
LAYOUT AND FUNCTION
16
4
LAYOUT AND FUNCTION
4.1
System overview
The VKS10 is an easy-to-install compact conductor system with a maximum load capacity of 280 A. In combi-
nation with a support profile developed in parallel, hanging distances of up to 4.5 m can be realized without
the need for costly auxiliary support structures. Due to the minimal phase spacing, the contact-protected sys-
tem requires very little space. Depending on the phase assignment, 3 - 6 poles are available for transmitting
control currents in addition to the power supply. In addition, the system allows for cost-effective integration of
various position measuring systems. These properties make the VKS system ideally suited for automated high-
bay warehouses.
4.2
Brief system description
VAHLE VKS10 conductor systems are contact-protected compact conductor systems. They consist of a flat in-
sulating housing into which the conductor rails are drawn. These conductors are contact-protected. They com-
ply with accident and VDE regulations in the electrical, mechanical and fire engineering sense and are
designed according to protection class IP21. The current collectors are protected against contact only if the
carbon brushes are fully located in the conductor rails. For conductor rail systems located at arm's length,
where under normal operation the current collectors leave the conductor rails, contact protection must be pro-
vided on site, e.g. by means of barriers or by switching off. This, however, only applies to ranges above 25 volts
AC or 60 volts DC.
The 10-pole insulating housing allows the installation of up to 10 rails in one profile. No special end finishing
is required. The compact design enables direct installation in track supports and VAHLE support profiles. The
conductor system must only be used for indoor systems. It can be positioned vertically or horizontally. Curved
tracks are only possible with horizontal installation.
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...