APPENDIx A – OIL BOILER IQ CONTROL SYSTEM
IQ Control System Overview
MPO-IQ Boiler uses a microprocessor based control system called the "IQ Control System". This "IQ Control System" consists of an
IQ Oil Boiler Control in conjunction with an Oil Primary Control and an IQ Option Panel with optional "plug-in" IQ Option Cards.
The IQ Control System fully integrates both factory and field installed components, simplifying installation and troubleshooting.
IQ Control System is designed to efficiently operate the entire boiler system to save energy and installation and setup time, while
ensuring adequate supply of heat and domestic hot water.
The IQ Option Panel works together with the IQ Oil Boiler Control to provide an easy and convenient means to "plug-in" an Auxiliary
High Limit, Low Water Cut-off, and/or Outdoor Reset functions.
The Manual Reset Low Water Cutoff and High Limit IQ Option Cards are CSD-1 compliant, which simplifies installations in areas
where CSD-1 is enforced. IQ Option Cards snap onto the IQ Option Panel supplied on all MPO-IQ boilers and feature Plug n' Play
connections.
IQ Oil Boiler Control: P/N 103851-01
The IQ Oil Boiler Control replaces the familiar Honeywell L7248 electronic Aquastat and contains several additional features. These
unique features allow the IQ Oil Boiler Control to connect the boiler's control system together in a way that was not previously
possible, greatly simplifying set-up and troubleshooting of the boiler.
IQ Option Card Major Features
• Plug-’n-play connection to MPO-IQ Boilers, only wiring required is to field installed sensors
• Status and error codes displayed on built-in 3-digit display
• Optional LCD touch screen display can also be used to read status and make adjustments
• Error codes can be displayed on EnviraCOM-enabled programmable thermostat
• Built-in diagnostics
• U.S. Boiler Company factory engineered and tested as part of a complete system
LED display provides the following information:
-
Boiler Status
- Standby, pre-purge, post purge, trial for
ignition, running, etc.,
-
Diagnostics
- CAD cell resistance, run time hours and
cycle counts
-
Error Monitoring
- Including primary control and
connected IQ Option Cards
(Note: Primary control information is only available when
an EnviraCOM enabled primary is connected)
• Outdoor Air Reset Ready - Operating Setpoint is
automatically adjusted by outdoor air temperature and heat
demand type when an Outdoor Air Reset IQ Option Card
is connected. Also, Operating Setpoint is adjusted by
thermostat “sleep” and “leave” modes when a setback
EnviraCOM enabled thermostat is connected.
• Warm Start Ready - boiler is started and circulator is stopped
when the boiler is cold and an external low limit is
connected.
• Smart Circulator Pre-purge - Upon a call for heat the
circulator is started and the boiler start is delayed. The
boiler is started without delay if the boiler is cold or there is
a DHW demand. Boiler cycling and resulting standby loses
are reduced by adjusting the circulator pre-purge time.
• "Energy Banking" Pump Overrun Time - The system
circulator may be run after the call for heat has ended to
“move” residual heat in the boiler to the system or indirect
water heater.
• Second Configurable Pump Output - In addition to the
system pump output the control has a second pump output
and associated input that may be configured for Domestic
Hot Water or second zone demand and pump control. This
second output eliminates the need for an external relay for
DHW pump control or the need for a zone panel used for a
two zone home.
• Boiler System Display - well-known electronic aquastat 3-digit
Содержание MPO - IQ
Страница 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Страница 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Страница 27: ...27 Figure 13A Recommended Water Piping for Circulator Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 28: ...28 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Страница 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Страница 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Страница 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Страница 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Страница 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Страница 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Страница 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Страница 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...