17
Figure 7: Internal Junction Box and Wiring Harness Details
TABLE 3: BAFFLE USAGE
Boiler Model
Baffle Usage
2
nd
Pass
3
rd
Pass
MPO-IQ84
None
[2]
P/N 100081-01
MPO-IQ115
[2]
P/N 102066-01
MPO-IQ147
[2]
P/N 100042-01
None
MPO-IQ189
MPO-IQ231
WARNING
Wire an additional safety limit such as a low water
cut-off or temperature limit device, other than an IQ
Control device, in series with the 120V circuit used
to power the boiler. Do Not alter the boiler's factory
wiring when adding additional limit.
4. Installing Boiler-ECOM harness (only used with
Honeywell Oil Primary).
Step a.
Locate the black Cat5 harness in the miscella-
neous parts carton.
Step b.
Plug RJ45 plug into receptacle on right side
panel, see Figure 1.
Step c.
Connect other end of harness into ECOM jack
on Oil Primary.
Step d.
Secure harness to right side jacket using the
two wire clamps located in miscellaneous parts
carton.
5. Installing stainless steel flueway baffles. Baffle
requirements differ from model to model, see Table 3.
NOTE:
Read caution statement
before
proceeding.
II. PACKAGED BOILER ASSEMBLY - TRIM & CONTROLS (cont'd)
CAUTION
These baffles will generate higher efficiencies and
lower stack temperatures. Under certain conditions,
a lower gross stack temperature entering the chimney
has the potential to be cooled below the dew point
and create condensate on interior surfaces. Flue
gas condensate is corrosive, which requires special
consideration and must be addressed immediately.
DO NOT
install baffles until you have read Section
V, "Venting" completely.
Содержание MPO - IQ
Страница 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Страница 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Страница 27: ...27 Figure 13A Recommended Water Piping for Circulator Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 28: ...28 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Страница 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Страница 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Страница 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Страница 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Страница 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Страница 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Страница 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Страница 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...