19
Figure 9: Oil Burner Installation (Beckett shown)
7.
Install oil burner.
(See Figure 9)
Step a.
Open burner carton and remove contents.
Step b.
Place oil burner gasket on burner and align
holes.
CAUTION
Do not install burner without gasket.
Step c.
Remove three (3) 5/16-18 x 3/4 lg. cap screw from
burner swing door used for mounting burner.
Step d.
Thread (1) 5/16-18 x 3/4 lg. cap screw,
approximately three (3) full turns, into tapping
located at 12:00 o'clock on burner swing door.
II. PACKAGED BOILER ASSEMBLY - TRIM & CONTROLS (cont'd)
Step e.
Insert oil burner into the opening of burner swing
door. Align and engage keyhole slot in burner flange
over head of protruding cap screw installed in previous
Step. Rotate burner to the right to lock flange behind
head of cap screw.
Step f.
Align holes and install two (2) remaining cap
screws. Level burner and fully tighten all three (3)
screws.
Step g.
Plug burner power cord into power outlet receptacle
located in lower right corner of front panel.
Step h.
Check oil nozzle in burner for size, angle and
spray type; inspect electrode settings and head/air
plate setting. Refer to Tables 15A thru 15C and 16 and
Section IX. Refer to Burner Manufacturer's Manual
for detail instructions.
Содержание MPO - IQ
Страница 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Страница 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Страница 27: ...27 Figure 13A Recommended Water Piping for Circulator Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 28: ...28 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Страница 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Страница 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Страница 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Страница 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Страница 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Страница 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Страница 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Страница 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...