46
Figure 30: Two Pipe Oil Lines
C.
TWO PIPE OIL LINES
1. For two piped systems, where more lift is required, the
two-stage fuel unit is recommended. Table 7 (two-stage)
and Table 8 (single-stage) show allowable lift and lengths
of 3/8 inch and 1/2 inch OD tubing for both suction and
return lines. Refer to Figure 30.
2. Follow the oil pump manufacturer’s recommendations
on the proper connections for a two pipe system. Some
manufacturers require the insertion of a bypass plug.
3. Under no circumstances is a manual shutoff valve to
be located on the return line of a two pipe system.
Accidental closure of the return line will rupture the oil
pump seals.
TABLE 7: TWO-STAGE UNITS (3450 RPM) -
TWO PIPE SYSTEMS
Lift "H"
(See Fig. 25)
Maximum Length of Tubing
"H" + "R" (See Figure)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
93'
100'
2'
85'
100'
4'
77'
100'
6'
69'
100'
8'
69'
100'
10
52'
100'
12'
44'
100'
14'
36'
100'
16'
27'
100'
18'
---
76'
TABLE 8: SINGLE-STAGE UNITS (3450 RPM) -
TWO PIPE SYSTEMS
Lift "H"
(See Fig. 25)
Maximum Length of Tubing
"H" + "R" (See Figure)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
84'
100'
1'
78'
100'
2'
73'
100'
3'
68'
100'
4'
63'
100'
5'
57'
100'
6'
52'
100'
7'
47'
100'
8'
42'
100'
9'
36'
100'
10'
31'
76'
11'
26'
100'
12'
21'
83'
13'
---
62'
14'
---
41'
VIII. OIL PIPING (continued)
Содержание MPO - IQ
Страница 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Страница 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Страница 27: ...27 Figure 13A Recommended Water Piping for Circulator Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 28: ...28 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Страница 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Страница 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Страница 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Страница 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Страница 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Страница 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Страница 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Страница 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...