89
APPENDIx B – FIGURES
Figure
Number
Page
Number Description
Figure 1
6
MPO-IQ84 Thru MPO-IQ231 Water Boiler
Section I - Pre-Installation
Figure 2A
8
Chimney Vented Boiler - Minimum Installation Clearances to Combustible Materials (Inches)
Figure 2B
9
Direct Vent Boiler - Minimum Installation Clearances to Combustible Materials (Inches)
Section II - Packaged Boiler Assembly - Trim & Controls
Figure 3
11
Packaged Boiler Removal from Skid
Figure 4A
12
Partial Front View - Burner Swing Door Mounted to Boiler - Fully Closed and Secured
Figure 4B
13
Top View - Burner Swing Door Mounted to Cast Iron Block Assembly
(Jacket Removed for Clarity)
Figure 4C
14
Top View - Burner Swing Door Fully Closed but Not Properly Secured or Sealed
Figure 4D
15
Burner Swing Door Insulation
Figure 5
15
Return Injector Piping and Relief Valve Assembly Details
Figure 6
16
Piping Arrangement for Drain Valve and Indirect Water Heating Return
Figure 7
17
Internal Junction Box and Wiring Harness Details
Figure 8
18
Baffle Orientation in Flueways
Figure 9
19
Oil Burner Installation (Beckett shown)
Section III - Unit-Pak Boiler Assembly - Trim & Controls
Figure 10
20
MPO-IQ Unit-Pak Boiler Shipment Contents (outside container removed)
Figure 11
22
Boiler Removal from Skid
Figure 12
25
Immersion Well Probe Insertion
Section IV - Water Boiler Piping
Figure 13A
27
Recommended Water Piping for Circulator Zoned Heating Systems
Figure 13B
28
Recommended Water Piping for Zone Valve Zoned Heating Systems
Figure 14
29
Near Boiler Piping
Section V - Natural Draft Venting
Figure 15
31
Recommended Vent Pipe Arrangement and Chimney Requirements
Figure 16
31
Proper and Improper Locations of Draft Regulator
Figure 17
32
Smokebox Pressure Tapping for Checking Draft at Breech
Section VI - Direct Venting / Air Intake Piping
Figure 18
34
Vent Terminal Location
Figure 19
35
Wall Cutout Dimensions
Figure 20
35
Vent Hood Body Installation
Figure 21
36
Combustion Air Tee Assembly Installation
Figure 22
36
FDVS Component Breakdown
Figure 23
37
Appliance Adapter Installation
Figure 24
37
Vent Pipe Assembly to Vent Termination Inner Pipe & Appliance Adapter
Figure 25
38
Vent Pipe Ends, Vent Termination & Appliance Adapter Sealing
Figure 26
39
Vent Pipe Assembly to Vent Termination Inner Pipe & Appliance Adapter
Figure 27
39
Oil Burner Installation (Beckett shown)
Содержание MPO - IQ
Страница 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Страница 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Страница 27: ...27 Figure 13A Recommended Water Piping for Circulator Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 28: ...28 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating Systems IV WATER Boiler PIPING continued ...
Страница 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Страница 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Страница 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Страница 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Страница 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Страница 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Страница 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Страница 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Страница 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...