55
8. Conventional Zone Valve Zoned System – Refer to Figure 36. If a system water temperature limit is used, refer to Figure
37. Wiring to the most popular models of zone valves is given in Figure 38.
Locate the group of two (2) wires (yellow and white) in the junction box at the inside top of the boiler jacket. Connect
wires from these boiler wire leads to the system circulator wire leads.
Locate the group of two (2) thermostat wires (black and black) inside the boiler jacket at the top (not inside the boiler
junction box. Connect wires from these boiler wire leads to the H1 and H2 of the R8889 control.
If a system water temperature limit (L4006 Aquastat) is used do not install in the H1 or H2 circuit. An additional Honey-
well R8225 relay is required. Refer to Figure 37 for this type of system.
Connect the thermostat of each zone and the zone valve for that zone to the R8889 control. If an Alliance™ indirect water
heater is used, connect the Alliance™ thermostat and zone valve to the “zone 1” terminals of the R8889.
Set the thermostat heat anticipator to 0.12 amps.
E
C
I
T
O
N
e
n
o
z
)
4
(
r
u
o
f
o
w
t
d
n
a
s
l
e
d
o
m
e
n
o
z
)
3
(
e
e
r
h
t
o
w
t
n
i
e
l
b
a
l
i
a
v
a
s
i
l
o
r
t
n
o
C
9
8
8
8
R
l
l
e
w
y
e
n
o
H
e
h
T
l
e
d
o
M
d
n
a
s
m
e
t
s
y
s
e
n
o
z
)
3
(
e
e
r
h
t
r
o
f
A
9
8
8
8
R
l
e
d
o
M
g
n
i
s
u
s
d
n
e
m
m
o
c
e
r
m
a
h
n
r
u
B
.
s
l
e
d
o
m
y
a
m
d
n
a
y
t
i
c
a
p
a
c
d
a
o
l
s
s
e
l
e
v
a
h
D
9
8
8
8
R
d
n
a
C
9
8
8
8
R
s
l
e
d
o
M
.
s
m
e
t
s
y
s
e
n
o
z
)
4
(
r
u
o
f
r
o
f
B
9
8
8
8
R
o
t
r
e
h
t
e
g
o
t
d
e
s
u
e
b
y
a
m
s
'
9
8
8
8
R
)
4
(
r
u
o
f
o
t
p
U
.
s
e
v
l
a
v
e
n
o
z
f
o
s
e
p
y
t
n
i
a
t
r
e
c
h
t
i
w
e
t
a
r
e
p
o
t
o
n
l
o
r
t
n
o
c
n
i
a
m
e
h
t
f
o
e
n
o
z
t
s
r
i
f
e
h
t
,
e
n
o
z
)
1
(
e
n
o
y
l
n
O
.
s
e
n
o
z
l
a
u
d
i
v
i
d
n
i
)
6
1
(
n
e
e
t
x
i
s
o
t
p
u
e
d
i
v
o
r
p
e
r
a
s
e
n
o
z
)
4
(
r
u
o
f
n
a
h
t
e
r
o
m
f
I
.
r
e
t
a
e
h
r
e
t
a
w
t
c
e
r
i
d
n
i
e
c
n
a
i
l
l
A
e
h
t
r
o
f
g
n
i
n
o
z
y
t
i
r
o
i
r
p
e
d
i
v
o
r
p
l
l
i
w
.
r
e
h
t
e
g
o
t
l
o
r
t
n
o
c
h
c
a
e
f
o
s
l
a
n
i
m
r
e
t
C
d
n
a
B
,
A
e
h
t
g
n
i
r
i
w
y
b
s
'
9
8
8
8
R
l
a
n
o
i
t
i
d
d
a
t
c
e
n
n
o
c
,
d
e
r
i
u
q
e
r
l
e
n
a
p
e
h
t
t
e
s
,
d
e
s
u
s
i
9
8
8
8
R
)
1
(
e
n
o
n
a
h
t
e
r
o
m
f
I
.
y
l
p
p
u
s
r
e
w
o
p
t
l
o
v
0
2
1
a
s
e
r
i
u
q
e
r
9
8
8
8
R
h
c
a
E
e
h
t
n
o
"
n
o
i
s
n
a
p
x
e
"
o
t
h
c
t
i
w
s
e
p
y
t
l
e
n
a
p
e
h
t
t
e
s
d
n
a
9
8
8
8
R
t
s
r
i
f
e
h
t
n
o
"
n
i
a
m
"
o
t
h
c
t
i
w
s
e
p
y
t
.
9
8
8
8
R
h
t
r
u
o
f
r
o
d
r
i
h
t
,
d
n
o
c
e
s
9. Burnham EC5000 Circulator Zoned System – Refer to Figure 39 of this manual for the electrical diagram for this type of
system. Wire the system as indicated in that diagram. Refer to the manual provided with the Burnham EC5000 Control
for control operation and setup details.
10. Burnham EC5000 Zone Valve Zoned System – Refer to Figure 40 of this manual for the electrical diagram for this type
of system. Wire the system as indicated in that diagram. Refer to the manual provided with the Burnham EC5000 for
control operation and setup details.
11. Radiant Floor Circulator Zoned System with Alliance™ Water Heater - Refer to Figure 41 of this manual for the
electrical diagram for this type of system. Wire the system as indicated in that diagram.
Refer to Burnham Radiant Heating Manual for additional information.
12. Radiant Floor Zone Valve Zone System with Alliance™ Water Heater - Refer to Figure 42 of this manual for the
electrical diagram for this type of system. Wire the system as indicated in that diagram.
E
C
I
T
O
N
e
h
t
o
t
r
o
s
n
e
s
s
i
h
t
t
n
u
o
M
.
r
o
s
n
e
s
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
a
s
e
d
u
l
c
n
i
l
o
r
t
n
o
C
0
0
0
5
C
E
m
a
h
n
r
u
B
e
h
T
.
e
p
i
p
y
l
p
p
u
s
r
e
l
i
o
b
e
h
t
n
o
r
o
s
n
e
s
s
i
h
t
t
n
u
o
m
t
o
n
o
D
.
g
n
i
p
i
p
y
l
p
p
u
s
m
e
t
s
y
s
0
0
0
5
C
E
m
a
h
n
r
u
B
h
t
i
w
d
e
d
e
e
n
t
o
n
s
i
)
t
a
t
s
a
u
q
A
6
0
0
4
L
(
t
i
m
i
l
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
l
a
n
o
i
t
i
d
d
a
n
A
.
r
o
s
n
e
s
e
r
u
t
a
r
e
p
m
e
t
m
e
t
s
y
s
a
s
a
h
y
d
a
e
r
l
a
l
o
r
t
n
o
c
e
h
t
e
c
n
i
s
l
o
r
t
n
o
C
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...