45
E.
Space heating and domestic water heating
with
Alliance™ water heater. Install Alliance water heater as
a separate heating zone. Refer to Alliance Installation,
Operating and Service Instructions for additional
information.
F.
If boiler is used in connection with refrigeration
systems
, boiler must be installed with chilled medium
piped in parallel with the heating boiler using appropri-
ate valves to prevent chilled medium from entering
boiler, see Figure 27. Also consult I=B=R Installation
and Piping Guides.
G.
If boiler is connected to heating coils
located in air
handling units where they may be exposed to refriger-
ated air, boiler piping must be equipped with fl ow
control valves to prevent gravity circulation of boiler
water during operation of cooling system.
H.
A hot water boiler installed above radiation level
must be provided with a low water cutoff device as part
of installation.
I
.
If a low water cutoff is required,
it must be mounted
in the system piping above the boiler. The minimum
safe water level of a hot water boiler is just above the
highest water containing cavity of the boiler; that is, a
hot water boiler must be full of water to operate safely.
Figure 27: Recommended Piping for Combination
Heating & Cooling (Refrigeration) System
J.
Oil, grease, and other foreign materials
which
accumulate in new hot water boilers and a new or
reworked system should be boiled out, and then
thoroughly fl ushed. A local qualifi ed water treatment
chemical specialist is a suggested source for recommen-
dations regarding appropriate chemical compounds and
concentrations which are compatible with local
environmental regulations.
K.
After the boiler and system have been cleaned and
fl ushed,
and before refi lling the entire system add
appropriate water treatment chemicals, if necessary, to
bring the pH between 7 and 11.
L.
If it is required to perform a long term pressure test
of the hydronic system
, the boiler should fi rst be
isolated to avoid a pressure loss due to the escape of air
trapped in the boiler.
To perform a long term pressure test including the
boiler, ALL trapped air must fi rst be removed from the
boiler.
A loss of pressure during such a test, with no visible
water leakage, is an indication that the boiler contained
trapped air.
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...