![U.S. Boiler Company Burnham Hydronics Revolution RV3 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/u-s-boiler-company/burnham-hydronics-revolution-rv3/burnham-hydronics-revolution-rv3_installation-operating-and-service-instructions_3142627002.webp)
2
IMPORTANT INFORMATION - READ CAREFULLY
NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the
installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction
shall be consulted before installations are made.
All wiring on boilers installed in the USA shall be made in accordance with the National Electrical Code and/or local regulations.
All wiring on boilers installed in Canada shall be made in accordance with the Canadian Electrical Code and/or local regulations.
R
E
G
N
A
D
y
n
a
r
o
s
i
h
t
f
o
y
t
i
n
i
c
i
v
e
h
t
n
i
s
d
i
u
q
i
l
r
o
s
r
o
p
a
v
e
l
b
a
m
m
a
l
f
r
e
h
t
o
r
o
e
n
i
l
o
s
a
g
e
s
u
r
o
e
r
o
t
s
T
O
N
O
D
.
e
c
n
a
i
l
p
p
a
r
e
h
t
o
l
a
c
i
r
t
c
e
l
e
y
n
a
h
c
u
o
t
T
O
N
O
D
-
e
c
n
a
i
l
p
p
a
y
n
a
e
t
a
r
e
p
o
o
t
y
r
t
T
O
N
O
D
,
s
r
o
p
a
v
s
a
g
l
l
e
m
s
u
o
y
f
I
y
l
e
t
o
m
e
r
a
m
o
r
f
r
e
i
l
p
p
u
s
s
a
g
e
h
t
l
l
a
c
,
y
l
e
t
a
i
d
e
m
m
I
.
g
n
i
d
l
i
u
b
e
h
t
n
i
e
n
o
h
p
y
n
a
e
s
u
r
o
h
c
t
i
w
s
t
c
a
t
n
o
c
,
e
l
b
a
l
i
a
v
a
n
u
s
i
r
e
i
l
p
p
u
s
e
h
t
f
i
r
o
s
n
o
i
t
c
u
r
t
s
n
i
s
'
r
e
i
l
p
p
u
s
s
a
g
e
h
t
w
o
l
l
o
F
.
e
n
o
h
p
d
e
t
a
c
o
l
.
t
n
e
m
t
r
a
p
e
d
e
r
i
f
e
h
t
R
E
G
N
A
D
n
o
i
t
a
u
t
i
s
s
u
o
d
r
a
z
a
h
y
l
t
n
e
n
i
m
m
i
n
a
s
e
t
a
c
i
d
n
I
,
h
t
a
e
d
n
i
t
l
u
s
e
r
l
l
i
w
,
d
e
d
i
o
v
a
t
o
n
f
i
,
h
c
i
h
w
y
t
r
e
p
o
r
p
l
a
i
t
n
a
t
s
b
u
s
r
o
y
r
u
j
n
i
s
u
o
i
r
e
s
.
e
g
a
m
a
d
G
N
I
N
R
A
W
n
o
i
t
a
u
t
i
s
s
u
o
d
r
a
z
a
h
y
l
l
a
i
t
n
e
t
o
p
a
s
e
t
a
c
i
d
n
I
,
h
t
a
e
d
n
i
t
l
u
s
e
r
d
l
u
o
c
,
d
e
d
i
o
v
a
t
o
n
f
i
,
h
c
i
h
w
y
t
r
e
p
o
r
p
l
a
i
t
n
a
t
s
b
u
s
r
o
y
r
u
j
n
i
s
u
o
i
r
e
s
.
e
g
a
m
a
d
N
O
I
T
U
A
C
n
o
i
t
a
u
t
i
s
s
u
o
d
r
a
z
a
h
y
l
l
a
i
t
n
e
t
o
p
a
s
e
t
a
c
i
d
n
I
n
i
t
l
u
s
e
r
y
a
m
,
d
e
d
i
o
v
a
t
o
n
f
i
,
h
c
i
h
w
y
t
r
e
p
o
r
p
r
o
y
r
u
j
n
i
r
o
n
i
m
r
o
e
t
a
r
e
d
o
m
.
e
g
a
m
a
d
E
C
I
T
O
N
n
o
s
n
o
i
t
c
u
r
t
s
n
i
l
a
i
c
e
p
s
s
e
t
a
c
i
d
n
I
e
c
n
a
n
e
t
n
i
a
m
r
o
,
n
o
i
t
a
r
e
p
o
,
n
o
i
t
a
l
l
a
t
s
n
i
o
t
d
e
t
a
l
e
r
t
o
n
t
u
b
t
n
a
t
r
o
p
m
i
e
r
a
h
c
i
h
w
.
s
d
r
a
z
a
h
y
r
u
j
n
i
l
a
n
o
s
r
e
p
The following terms are used throughout this manual to bring attention to the presence of hazards of various risk levels,
or to important information concerning product life.
This Revolution
®
Boiler has been approved by the Massachusetts Board of Plumbers and Gas Fitters:
Approval No. G1-0698-26.
The Commonwealth of Massachusetts requires this product to be installed by a licensed Plumber or Gas Fitter.
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...