![U.S. Boiler Company Burnham Hydronics Revolution RV3 Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/u-s-boiler-company/burnham-hydronics-revolution-rv3/burnham-hydronics-revolution-rv3_installation-operating-and-service-instructions_3142627049.webp)
49
Table 7: Maximum Capacity of Schedule 40 Pipe in CFH* For Gas Pressures of 0.5 psig or Less
Figure 30: Recommended Gas Piping
Table 8: Equivalent Lengths of Standard Pipe Fittings & Valves
G
N
I
N
R
A
W
n
o
s
d
n
u
o
p
m
o
c
d
a
e
r
h
t
r
e
p
o
r
p
e
s
u
o
t
e
r
u
l
i
a
F
f
o
s
k
a
e
l
n
i
t
l
u
s
e
r
y
a
m
s
r
o
t
c
e
n
n
o
c
s
a
g
l
l
a
.
s
a
g
e
l
b
a
m
m
a
l
f
G
N
I
N
R
A
W
e
b
t
s
u
m
m
e
t
s
y
s
d
n
a
r
e
l
i
o
b
o
t
y
l
p
p
u
s
s
a
G
r
o
g
n
i
l
l
a
t
s
n
i
o
t
r
o
i
r
p
f
f
o
t
u
h
s
y
l
e
t
u
l
o
s
b
a
.
g
n
i
p
i
p
s
a
g
r
e
l
i
o
b
g
n
i
c
i
v
r
e
s
1. Use methods and materials in accordance with local
plumbing codes and requirements of gas supplier. In
absence of such requirements, follow
National Fuel
Gas Code
, NFPA 54/ANSI Z223.1.
2. Use thread (joint) compounds (pipe dope) resistant
to action of liquefi ed petroleum gas.
* 1 CFH of Natural Gas is approximately equal to 1 MBH; 1 CFH of LP is approximately equal to 2.5 MBH; con-
tact your gas supplier for the actual heating value of your gas.
3. Install sediment trap, ground-joint union and manual
shut-off valve upstream of boiler gas control valve
and outside jacket. See Figure 30.
h
t
g
n
e
L
]
t
e
e
F
[
p
o
r
D
e
r
u
s
s
e
r
P
.
c
.
w
h
c
n
i
3
.
0
p
o
r
D
e
r
u
s
s
e
r
P
.
c
.
w
h
c
n
i
5
.
0
½
¾
1
¼
1
½
¾
1
¼
1
0
1
2
3
1
8
7
2
0
2
5
0
5
0
,
1
5
7
1
0
6
3
0
8
6
0
0
4
,
1
0
2
2
9
0
9
1
0
5
3
0
3
7
0
2
1
0
5
2
5
6
4
0
5
9
0
3
3
7
2
5
1
5
8
2
0
9
5
7
9
0
0
2
5
7
3
0
7
7
0
4
3
6
0
3
1
5
4
2
0
0
5
2
8
0
7
1
0
2
3
0
6
6
0
5
6
5
5
1
1
5
1
2
0
4
4
3
7
1
5
1
5
8
2
0
8
5
0
6
0
5
5
0
1
5
9
1
0
0
4
6
6
8
3
1
0
6
2
0
3
5
0
7
6
4
6
9
0
8
1
0
7
3
1
6
5
2
1
0
4
2
0
9
4
0
8
3
4
0
9
0
7
1
0
5
3
7
5
8
1
1
0
2
2
0
6
4
0
9
0
4
4
8
0
6
1
0
2
3
3
5
0
1
1
5
0
2
0
3
4
0
0
1
8
3
9
7
0
5
1
5
0
3
0
5
3
0
1
5
9
1
0
0
4
N
E
P
O
Y
L
L
U
F
S
E
V
L
A
V
e
p
i
P
e
z
i
S
.
D
.
I
s
e
h
c
n
I
e
t
a
G
e
b
o
l
G
e
l
g
n
A
g
n
i
w
S
k
c
e
h
C
°
0
9
w
o
b
l
E
°
5
4
w
o
b
l
E
w
o
l
F
,
e
e
T
°
0
9
n
u
R
h
g
u
o
r
h
T
w
o
l
F
,
e
e
T
°
0
9
h
c
n
a
r
B
h
g
u
o
r
h
T
"
½
2
2
6
.
0
5
3
.
0
6
.
8
1
3
.
9
3
.
4
6
.
1
8
7
.
0
0
.
1
1
.
3
"
¾
4
2
8
.
0
4
4
.
0
1
.
3
2
5
.
1
1
3
.
5
1
.
2
7
9
.
0
4
.
1
1
.
4
"
1
9
4
0
.
1
6
5
.
0
4
.
9
2
7
.
4
1
8
.
6
6
.
2
3
2
.
1
8
.
1
3
.
5
"
¼
1
0
8
3
.
1
4
7
.
0
6
.
8
3
3
.
9
1
9
.
8
5
.
3
0
6
.
1
3
.
2
9
.
6
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...