![U.S. Boiler Company Burnham Hydronics Revolution RV3 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/u-s-boiler-company/burnham-hydronics-revolution-rv3/burnham-hydronics-revolution-rv3_installation-operating-and-service-instructions_3142627051.webp)
51
VII. Electrical
A.
General.
Install wiring and electrically ground boiler in
accordance with authority having jurisdiction or, in the
absence of such requirements, follow the
National
Electrical Code
, NFPA 70, and/or CSA C22.1 Electrical
Code.
B.
A separate electrical circuit must be run from the main
electrical service with an over-current device/discon-
nect in the circuit. A service switch is recommended
and may be required by some local jurisdictions. Install
the service switch in the line voltage “Hot” leg of the
power supply. Locate the service switch such that the
boiler can be shut-off without exposing personnel to
danger in the event of an emergency. Connect the main
power supply and ground to the three (3) boiler wires
(black, white and green) located in the junction box at
the inside top of the boiler jacket. If a low water cutoff
is to be used, connect the low water cutoff so that all
120V power to boiler is interrupted if the low water
cutoff’s switch opens.
C.
Refer to Figures 31 and 32 for details on the internal
boiler wiring.
E
C
I
T
O
N
f
o
g
n
i
r
i
w
l
a
n
r
e
t
n
i
e
h
t
e
d
i
s
n
i
d
e
t
a
c
o
l
t
i
m
i
l
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
h
g
i
h
a
h
t
i
w
d
e
p
p
i
u
q
e
s
i
r
e
l
i
o
b
s
i
h
T
s
d
e
e
c
x
e
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
r
e
l
i
o
b
e
h
t
t
n
e
v
e
e
h
t
n
i
n
w
o
d
t
u
h
s
r
e
l
i
o
b
s
e
d
i
v
o
r
p
t
i
m
i
l
s
i
h
T
.
r
e
l
i
o
b
e
h
t
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
l
a
n
o
i
t
i
d
d
a
n
a
e
r
i
u
q
e
r
s
e
d
o
C
l
a
c
o
L
n
i
a
t
r
e
C
.
l
o
r
t
n
o
c
t
i
m
i
l
e
h
t
f
o
t
n
i
o
p
t
e
s
e
h
t
t
e
s
m
u
m
i
n
i
m
e
h
t
w
o
l
e
b
s
e
r
u
t
a
r
e
p
m
e
t
t
a
e
t
a
r
e
p
o
y
a
m
s
m
e
t
s
y
s
f
o
s
e
p
y
t
n
i
a
t
r
e
c
,
n
o
i
t
i
d
d
a
n
I
.
t
i
m
i
l
.
r
e
l
i
o
b
e
h
t
n
i
d
e
n
i
a
t
n
o
c
t
i
m
i
l
e
h
t
f
o
t
n
i
o
p
n
i
d
e
t
a
c
o
l
)
t
a
t
s
a
u
q
A
6
0
0
4
L
l
l
e
w
y
e
n
o
H
(
t
i
m
i
l
e
r
u
t
a
r
e
p
m
e
t
r
e
t
a
w
l
a
n
o
i
t
i
d
d
a
n
a
l
l
a
t
s
n
i
,
s
r
u
c
c
o
s
i
h
t
f
I
s
a
e
r
i
W
.
l
a
u
n
a
m
s
i
h
t
f
o
n
o
i
t
c
e
S
m
i
r
T
d
n
a
g
n
i
p
i
P
r
e
t
a
W
e
h
t
n
i
n
w
o
h
s
s
a
g
n
i
p
i
p
m
e
t
s
y
s
e
h
t
.
l
a
u
n
a
m
s
i
h
t
f
o
n
o
i
t
c
e
S
l
a
c
i
r
t
c
e
l
E
e
h
t
n
i
d
e
t
a
c
i
d
n
i
E
C
I
T
O
N
.
d
e
t
o
n
e
s
i
w
r
e
h
t
o
s
s
e
l
n
u
d
e
i
l
p
p
u
s
r
e
l
l
a
t
s
n
i
e
r
a
.
c
t
e
s
l
o
r
t
n
o
c
,
s
t
u
n
e
r
i
w
,
e
r
i
w
l
l
A
R
E
G
N
A
D
e
c
i
v
r
e
s
r
o
n
o
i
t
a
l
l
a
t
s
n
i
g
n
i
t
p
m
e
t
t
a
e
r
o
f
e
b
d
e
r
e
w
o
p
n
u
e
r
a
s
n
o
i
t
c
e
n
n
o
c
l
a
c
i
r
t
c
e
l
e
l
l
a
e
r
u
s
s
a
y
l
e
v
i
t
i
s
o
P
h
t
i
w
s
e
x
o
b
l
a
c
i
r
t
c
e
l
e
l
l
a
t
u
o
k
c
o
L
.
g
n
i
d
l
i
u
b
r
o
r
e
l
i
o
b
e
h
t
f
o
s
n
o
i
t
c
e
n
n
o
c
r
o
s
t
n
e
n
o
p
m
o
c
l
a
c
i
r
t
c
e
l
e
f
o
.
f
f
o
d
e
n
r
u
t
s
i
r
e
w
o
p
e
c
n
o
k
c
o
l
d
a
p
G
N
I
N
R
A
W
l
a
c
i
s
y
h
p
s
u
o
i
r
e
s
n
i
t
l
u
s
e
r
y
a
m
r
e
l
i
o
b
e
h
t
o
t
s
n
o
i
t
c
e
n
n
o
c
l
a
c
i
r
t
c
e
l
e
e
r
i
w
y
l
r
e
p
o
r
p
o
t
e
r
u
l
i
a
F
.
m
r
a
h
e
r
o
f
e
b
f
f
o
s
i
r
e
w
o
p
l
l
a
e
r
u
s
e
k
a
M
.
e
c
r
u
o
s
e
n
o
n
a
h
t
e
r
o
m
m
o
r
f
e
b
y
a
m
r
e
w
o
p
l
a
c
i
r
t
c
e
l
E
.
k
r
o
w
l
a
c
i
r
t
c
e
l
e
y
n
a
g
n
i
t
p
m
e
t
t
a
.
e
c
i
v
e
d
t
n
e
r
r
u
c
-
r
e
v
o
d
e
z
i
s
y
l
r
e
p
o
r
p
a
h
t
i
w
d
e
t
c
e
t
o
r
p
e
b
t
s
u
m
r
e
l
i
o
b
h
c
a
E
.
s
l
o
r
t
n
o
c
g
n
i
t
a
r
e
p
o
r
o
y
t
e
f
a
s
y
n
a
e
v
i
t
a
r
e
p
o
n
i
e
k
a
m
r
o
t
u
o
p
m
u
j
r
e
v
e
N
r
e
l
i
o
b
h
c
a
E
.
y
l
n
o
s
e
s
o
p
r
u
p
e
c
n
e
r
e
f
e
r
r
o
f
e
r
a
l
a
u
n
a
m
s
i
h
t
n
i
d
e
n
i
a
t
n
o
c
s
m
a
r
g
a
i
d
g
n
i
r
i
w
e
h
T
e
h
t
d
n
a
m
a
r
g
a
i
d
s
i
h
t
o
t
r
e
f
e
R
.
r
o
o
d
t
n
o
r
f
e
h
t
o
t
d
e
h
c
a
t
t
a
m
a
r
g
a
i
d
g
n
i
r
i
w
a
h
t
i
w
d
e
p
p
i
h
s
s
i
g
n
i
r
i
w
l
l
a
w
o
l
l
o
f
d
n
a
d
n
a
t
s
r
e
d
n
u
,
d
a
e
R
.
r
e
l
i
o
b
e
h
t
h
t
i
w
d
e
s
u
s
l
o
r
t
n
o
c
y
n
a
f
o
m
a
r
g
a
i
d
g
n
i
r
i
w
.
s
l
o
r
t
n
o
c
e
h
t
h
t
i
w
d
e
i
l
p
p
u
s
s
n
o
i
t
c
u
r
t
s
n
i
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...