Vertical Venting
–
1. Do not exceed maximum vent lengths. Refer to
Table 4.
2. Slope horizontal runs minimum ¼ inch per foot
down towards boiler.
3. Install fi re stops where vent passes through fl oors,
ceilings or framed walls. The fi re stop must close
the opening between the vent pipe and the structure.
Fire stop manufacturers are Air-Jet, American Metal
Products, Metal-Fab, and Simpson Dura-Vent.
4. Whenever possible, install vent straight through the
roof. Refer to Figure 7 if offset is necessary.
Maintain minimum clearance to combustible
materials.
5. Install Vent Terminal.
a. Size roof opening to maintain minimum clear-
ance from combustible materials.
b. Extend vent pipe to maintain minimum vertical
and horizontal distance of twelve (12) inches
from roof surface. Allow additional vertical
distance for expected snow accumulation.
Provide brace as required. Refer to Figure 8.
c. Vertical venting requires use of the roof fl ashing
and storm collar to prevent moisture from
entering the structure.
d. Install storm collar on vent pipe immediately
above fl ashing. Apply Dow Corning Silastic 732
RTV Sealant between vent pipe and storm collar
to provide weathertight seal.
e. Attach vent terminal.
Vertical Air Intake Piping
–
6. Do not exceed maximum air intake length. Refer to
Table 4.
G. Separate Vertical Venting System
- See Figures 6, 7, 8 and 9.
E
C
I
T
O
N
t
o
n
s
t
n
e
n
o
p
m
o
c
s
e
r
i
u
q
e
r
m
e
t
s
y
s
t
n
e
v
s
i
h
T
.
r
e
l
i
o
b
e
h
t
h
t
i
w
d
e
i
l
p
p
u
s
n
o
i
t
p
i
r
c
s
e
D
n
o
t
r
a
C
r
e
b
m
u
N
t
r
a
P
t
n
e
n
o
p
m
o
C
r
e
b
m
u
N
t
r
a
P
s
e
i
r
o
s
s
e
c
c
A
t
n
e
V
l
a
c
i
t
r
e
V
)
w
o
l
e
b
s
m
e
t
i
s
e
d
u
l
c
n
i
(
)
7
V
R
-
3
V
R
(
2
6
0
6
1
1
6
-
-
-
-
-
-
-
l
a
c
i
t
r
e
V
,
l
a
n
i
m
r
e
T
t
n
e
V
-
-
-
-
-
-
-
1
6
0
6
1
1
6
"
3
,
g
n
i
h
s
a
l
F
f
o
o
R
-
-
-
-
-
-
-
0
5
2
6
1
1
8
S
"
3
,
r
a
ll
o
C
m
r
o
t
-
-
-
-
-
-
-
1
5
2
6
1
1
8
S
T
N
E
N
O
P
M
O
C
M
E
T
S
Y
S
G
N
I
T
N
E
V
L
A
C
I
T
R
E
V
E
T
A
R
A
P
E
S
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...