3. Pipe must be full round shape, and show no damage
from impact or excessive temperature.
4. Pipe must be supported at minimum fi ve (5) foot
intervals and must not sag.
5. All vent joints must be secure and watertight.
6. All air intake joints must be secure and airtight.
Horizontal vent tee drain or vertical vent tee drain
(if used) must have minimum 6 inch trap and allow
condensate to fl ow freely. To Clean:
a. Disconnect drain tube from drain fi tting.
b. Flush drain tube with water. Fill trap with water.
c. Securely fasten drain tube to drain fi tting,
providing gas-tight and watertight seal.
7. If pipe must be disassembled for removal of
obstructions or resealing of joint, see Section III,
Paragraphs C through E.
D.
Boiler Flue Passages.
Inspect for blockage or soot
accumulation.
1. Remove Main Burners. See Figure 53.
a. Remove front door.
b. Remove air intake box front door.
i
.
Remove sheet metal screws.
c. Disconnect pilot tubing and pilot lead wires at
the gas valve.
d. Remove wires to Flame Roll-out Switch (RV3-
RV6 only).
e. Remove Burner Access Panel.
f. Mark location of Main Burner with Pilot Bracket
on gas manifold.
g. Hold Main Burner on throat. Lift front of
burners to clear orifi ce. Burner which holds pilot
can be removed by lifting the burner adjacent to
its right fi rst.
2. Remove Jacket Top Rear Panel.
3. Disconnect Black Silicone Tubing from Canopy.
4. Remove Canopy Assembly.
a. Loosen carriage bolts.
b. Pry canopy from boiler sections.
5. Remove Flue Gas Baffl es. Inspect Flue Gas Baffl es
for deterioration.
6. Inspect fl ue passages. Clean with fl ue brush. See
Figure 53.
7. Inspect heating surface in combustion chamber.
Clean with straight handle wire brush.
8. Install Flue Gas Baffl es.
9. Replace Canopy Assembly and seal.
10. Connect Silicone Tubing between Pressure Fittings
on Canopy Assembly and Pressure Switch. Route
through bushings in Vestibule Panel . See Figure
51.
11. Install Jacket Top Rear Panel.
12. Connect vent system. See Figure 52.
13. Ensure orifi ce plate and new two (2) gaskets are in
place. See Figure 52.
Figure 51: Silicone Tubing Assembly
Figure 52: Blower Vent Connector Assembly
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...