43
1. Each boiler contains two (2) condensate drain tubes.
Insert both tubes into the condensate trap provided
with boiler. See Figure 26.
a. Ensure tubes are inserted so that tube ends
contact trap bottom.
Note: Wetting tubes will aid in insertion.
b. Insert trap assembly into 2-1/8 inch diameter
hole in base tray. Install condensate trap holding
clip and secure with two (2) screws provided.
Note: Locate trap discharge opening in direction
of condensate piping opening in jacket left side
panel.
N
O
I
T
U
A
C
m
e
t
s
y
s
e
t
a
s
n
e
d
n
o
c
e
p
i
p
y
l
r
e
p
o
r
p
o
t
e
r
u
l
i
a
F
l
l
a
t
s
n
i
t
o
n
o
D
.
e
f
i
l
r
e
l
i
o
b
e
c
u
d
e
r
y
l
t
a
e
r
g
l
l
i
w
e
t
a
s
n
e
d
n
o
c
n
o
s
e
v
l
a
v
r
o
s
p
a
c
,
s
g
u
l
p
s
n
i
a
r
d
e
t
a
s
n
e
d
n
o
c
t
c
e
n
n
o
c
t
o
n
o
D
.
g
n
i
p
i
p
e
t
a
s
n
e
d
n
o
c
f
o
e
z
i
s
e
c
u
d
e
r
t
o
n
o
D
.
r
e
h
t
e
g
o
t
.
g
n
i
p
i
p
2. Pipe condensate trap to a fl oor drain or condensate
pump/sump.
3. Use ¾” PVC or CPVC for condensate piping.
4. Consult local authorities regarding disposal of fl ue
gas condensate into public waste water system.
Some jurisdictions require that the condensation be
buffered before discharge. This buffering is
commonly achieved by draining the condensate
through a limestone bed. Consult chemical treat-
ment company for buffering systems.
5. Fill trap with water prior to starting boiler.
E
C
I
T
O
N
r
e
t
a
w
p
a
r
t
e
t
a
s
n
e
d
n
o
c
t
c
e
p
s
n
i
y
l
l
a
c
i
d
o
i
r
e
P
p
a
r
t
o
t
l
e
v
e
l
g
n
i
r
b
o
t
r
e
t
a
w
d
d
a
,
w
o
l
f
I
.
l
e
v
e
l
.
e
g
r
a
h
c
s
i
d
If water in trap evaporates rapidly due to ambient
conditions, propylene glycol may be added or
substituted to inhibit evaporation.
IV. Condensate Drains
Figure 26: Condensate Trap/Hoses Installation
Содержание Burnham Hydronics Revolution RV3
Страница 5: ...5 Figure 2 Dimensions...
Страница 15: ...15 Figure 4 Recommended Separate Horizontal Vent Air Intake Installation...
Страница 16: ...16 Figure 5 Separate Horizontal Vent Air Intake Terminal Confi guration...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 21: ...21 Figure 9 Vertical Air Intake Piping...
Страница 24: ...24 Figure 10 Combination Horizontal Vent Air Installation...
Страница 25: ...25 Figure 11 Combination Horizontal Vent Air Terminal Installation...
Страница 30: ...30 Figure 13 Combination Vertical Air Intake Terminal Assembly...
Страница 31: ...31 Figure 14 Combination Vertical Vent Disc Terminal Assembly...
Страница 34: ...34 Figure 15 Indoor Air Horizontal Vent Installation...
Страница 35: ...35 Figure 16 Indoor Air Vertical Vent Installation...
Страница 37: ...37 Figure 19 Indoor Air Air Intake Terminal Installation...
Страница 46: ...46 Figure 28 Recommended Boiler Piping For Circulator Zoned Heating Systems...
Страница 47: ...47 Figure 29 Boiler Piping for Zone Valve Zoned Systems...
Страница 52: ...52 Figure 31 Internal Boiler Wiring Schematic Diagram...
Страница 56: ...56 Figure 33 Single Heating Zone Only Wiring Schematic...
Страница 58: ...58 Figure 35 Circulator Zoned System Wiring Schematic...
Страница 59: ...59 Figure 36 Zone Valve Zoned System Wiring Schematic...
Страница 60: ...60 Figure 37 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 38 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 62: ...62 Figure 39 Circulator Zoning with EC5000 Wiring Schematic...
Страница 63: ...63 Figure 40 Zone Valve Zoning with EC5000 Wiring Schematic...
Страница 64: ...64 Figure 41 Radiant Floor Circulator Zoned System with Alliance Water Heater...
Страница 65: ...65 Figure 42 Radiant Floor Zone Valve Zoned System with Alliance Water Heater...
Страница 68: ...68 Figure 43 Modular Boiler Piping...
Страница 69: ...69 Figure 44 Alternate Modular Boiler Piping...
Страница 71: ...71 Figure 45 Operating Instructions...
Страница 74: ...74 Figure 49 Variable Speed Control Sequence of Operation Figure 50 Internal Primary Secondary Piping...
Страница 77: ...77 Figure 53 Cleaning Boiler Flue Passages...
Страница 80: ...80 Revolution Troubleshooting Tree...
Страница 81: ...81 Revolution Troubleshooting Tree...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 92: ...92...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 96: ...96 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 97: ...97 SERVICE RECORD DATE SERVICE PERFORMED...