TrinityHighway.com
42
Revision C September 2021
Maintenance and Repair
Important:
Inspections are recommended, as needed, based upon volume of
traffic and impact history. Visual Drive-By Inspections are recommended at least
once a month. Walk-Up Inspections are recommended at least once a year.
Visual Drive-By Inspection
1) Encountering a system with the Hit Indicator in the vertical position mandates inspection
of the system. A walk-up inspection will be necessary.
2) Inspect the system in accordance with the QuadGuard
®
Elite M10 Maintenance Flow Chart
(p. 48).
Caution:
It is important to inspect a system after it has been impacted even if it
appears to be self-restored and fully maintained. In particular, check the Fender
Panels/Diaphragm attachment bolts to be sure none have failed.
3) Be sure the Nose assembly is in place and in good condition.
4) Note the location and condition of the QuadGuard
®
Elite M10 and the date of visual drive-
by inspection.
Walk-Up Inspection
Warning:
A system that has been impacted can store energy in collapsed
Cylinders and may spring back unexpectedly causing possible serious injury. Use
caution when inspecting, disassembling or restoring systems that are collapsed or
compressed by any amount.
Maintenance Checklist
1) Clear and dispose of any debris on the site. Check along length of Monorail and remove
any debris.
2) All bolts are tight and rust free.
3) Monorail Anchor Nuts are securely anchored.
4) Diaphragm Legs are straight.
5) All Mushroom Washer Assemblies are properly aligned and positioned (p. 44).
6) Fender Panels and Transition Panels should nest tightly against the system. For wrong
way traffic, the maximum gap allowed is .78” [20 mm].
7) All Cylinders are in good condition and are properly positioned within each Bay.
8) Always inspect system if the Hit Indicator is in the UP position even if the system appears
normal.
9) Reset Hit Indicator after inspection and restoration of the QuadGuard
®
Elite M10.
Содержание QuadGuard Elite M10
Страница 1: ......
Страница 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Страница 12: ...TrinityHighway com 11 Revision C September 2021 ME2 Cylinder Assembly 618649 ME1 Cylinder Assembly 618538...
Страница 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Страница 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Страница 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 53: ...TrinityHighway com 52 Revision C September 2021 4 Offset Safety Shape Transition QGEMTSCVR T4LR...
Страница 54: ...TrinityHighway com 53 Revision C September 2021 6 Offset Single Slope Transition QGEMTSCVR T6LR...
Страница 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Страница 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Страница 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Страница 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Страница 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Страница 60: ......