Revision C September 2021
3) Clean the Boreholes
Blow the concrete dust from the borehole using (90 psi) oil-free compressed air. Thoroughly
brush the borehole with a 7/8” diameter steel bristle tube brush and then blow it out again. If
the borehole is wet, completely flush it with water while brushing and then blow it clean to
remove all water using oil-free compressed air.
Note:
Use of the Trinity Highway approved vacuum drilling equipment is authorized to replace
the blowing and brushing requirement of Step 3.
4) Apply Approved Adhesive
Fill the borehole 100% full.
Caution:
Fill borehole 100% full so it is even with the pavement surface per the
adhesive manufacturer’s instructions.
5) Add the Washers and Nuts
Place a flat washer onto the stud then thread a nut on until the end of
the stud is flush with the nut (Figure 7).
6) Insert Studs in Boreholes and Wait for Adhesive to Cure
Push the stud down through the part to be anchored and into the
borehole.
Warning:
Do not disturb or load the stud until the approved
adhesive material has fully cured (reference instructions
supplied with the approved adhesive kit).
7) Torque the Nuts
Once the adhesive has fully cured, torque each nut to 100 ft-lb.
Anchor Assembly Cautions for Steel Rebar
If steel rebar is encountered while drilling an anchor bolt borehole, apply one of the following
solutions:
1) Use a rebar drill bit for the
rebar
only
and then switch back to the concrete bit to finish
drilling into the underlying concrete until the proper borehole depth is reached.
Caution:
Do not drill through rebar without first obtaining permission to do so
from the project engineer.
2) Drill a new borehole down at an angle past the rebar to the proper depth. Anchor the
stud by completely filling both boreholes with an approved adhesive.
Figure 7
Anchor Application
(Before Applied Torque)
Содержание QuadGuard Elite M10
Страница 1: ......
Страница 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Страница 12: ...TrinityHighway com 11 Revision C September 2021 ME2 Cylinder Assembly 618649 ME1 Cylinder Assembly 618538...
Страница 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Страница 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Страница 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 53: ...TrinityHighway com 52 Revision C September 2021 4 Offset Safety Shape Transition QGEMTSCVR T4LR...
Страница 54: ...TrinityHighway com 53 Revision C September 2021 6 Offset Single Slope Transition QGEMTSCVR T6LR...
Страница 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Страница 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Страница 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Страница 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Страница 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Страница 60: ......