TrinityHighway.com
43
Revision C September 2021
Important:
The energy absorbing HDPE Cylinders lose their ability to absorb
energy with increasing number of system impacts. After multiple full capacity
design impacts, the system will no longer be able to meet the requirements as
specified in MASH. To ensure that Cylinder replacement is accomplished before
this condition occurs, it is essential that this part of the inspection be conducted
every time the Hit Indicator indicates the system has been impacted.
The rear-most Cylinder must measure at least 26” [660 mm] for proper impact performance
(Figure 39). If distance is less than 26” [660 mm], replace all ME1 and ME2 Cylinders. If distance
is greater than 26” [660 mm], inspect all Cylinders for major cracks, tears or cuts. Replace any
damaged Cylinders. Please call the Trinity Highway Customer Service Department if you have
any questions (p. 3).
10) Ensure the system is deployed to its full length.
Caution:
Systems that are not restored to their full length may not perform to
impact performance standards of MASH.
11) Make all necessary repairs as described above and see the following page for Post-Impact
Instructions.
12) Reset Hit Indicator if necessary.
13) Note the location and condition of the QuadGuard
®
Elite M10, and any work done, in your
Impact Attenuator Inspection Logbook
under the date of this inspection. If further repair
is required, note repair request date in logbook. Walk-up inspections are recommended
as needed based upon volume of traffic and impact history. Refer to Post-Impact
Instructions on the next page for more information.
Figure 40
Mushroom Washer Orientation
26” [660 mm]
LAST
BAY
Figure 39
Distance Across
Minor Axis of ME2 Cylinder
CORRECT
INCORRECT
Содержание QuadGuard Elite M10
Страница 1: ......
Страница 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Страница 12: ...TrinityHighway com 11 Revision C September 2021 ME2 Cylinder Assembly 618649 ME1 Cylinder Assembly 618538...
Страница 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Страница 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Страница 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 53: ...TrinityHighway com 52 Revision C September 2021 4 Offset Safety Shape Transition QGEMTSCVR T4LR...
Страница 54: ...TrinityHighway com 53 Revision C September 2021 6 Offset Single Slope Transition QGEMTSCVR T6LR...
Страница 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Страница 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Страница 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Страница 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Страница 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Страница 60: ......