TrinityHighway.com
40
Revision C September 2021
16) Checking The System
At this point tighten all Mushroom Bolts and recheck to ensure that all fasteners are properly
tightened throughout the system (anchor bolts, etc.). Check all Fender Panels. If they do not fit
tightly against the underlying panel, system realignment may be necessary (Figure 38).
Bolt Torque Specifications
Warning:
Anchor Studs
Torque to 100 ft-lb
Shall Not protrude above nuts
(p. 29, Figure 18)
All Other Bolts
Tightened
Fender Panel
Maximum gap allowed:
Narrow Systems – 0.78” [20 mm]
Pre-Assembled System Installation Instructions
The QuadGuard Elite M10 may be ordered pre-assembled. Pre- assembled systems
come in two 4-Bay sections.
A forklift or equivalent is required for installation.
A.
Remove one Monorail Guide from the same side of each Diaphragm of both pre-
assembled sections.
B.
Unbolt the rear Cylinder and rear Fender Panels from the Backup.
C.
Lift each 4-Bay section away from the Backup and Monorails.
D.
Place the Backup and Monorails into position and install anchors (pp. 27-29).
E.
Lift the rear section onto the Monorail and against the Backup.
F.
Reconnect rear Cylinder and Fender Panels to Backup (p. 35).
G.
Lift the front section onto the Monorail and push it back until it contacts the front Diaphragm
of the rear section.
H.
Reattach ME3/ME2 Cylinders, mushroom washers, and monorail guide assemblies at
each diaphragm.
Figure 38
Fender Panel Gap
MAXIMUM GAP = .78” [20 mm]
FENDER PANEL
UNDERLYING FENDER,
TRANSITION, EXTENSION
OR SIDE PANEL
TRAFFIC
Содержание QuadGuard Elite M10
Страница 1: ......
Страница 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Страница 12: ...TrinityHighway com 11 Revision C September 2021 ME2 Cylinder Assembly 618649 ME1 Cylinder Assembly 618538...
Страница 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Страница 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Страница 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 53: ...TrinityHighway com 52 Revision C September 2021 4 Offset Safety Shape Transition QGEMTSCVR T4LR...
Страница 54: ...TrinityHighway com 53 Revision C September 2021 6 Offset Single Slope Transition QGEMTSCVR T6LR...
Страница 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Страница 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Страница 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Страница 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Страница 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Страница 60: ......