39
Revision A August 2020
Note:
The energy absorbing HDPE Cylinders lose their ability to absorb energy with increasing
number of system impacts. After multiple full capacity design impacts, the system will no longer
be able to meet the requirements as specified in MASH. To ensure that Cylinder replacement is
accomplished before this condition occurs, it is essential that this part of the inspection be
conducted every time the Hit Indicator indicates the system has been impacted.
The rear-most Cylinder must measure at least 26” [660 mm] for proper impact performance
(Figure 42). If distance is less than 26” [660 mm], replace all ME1 and ME2 Cylinders. If distance
is greater than 26” [660 mm], inspect all Cylinders for major cracks, tears or cuts. Replace any
damaged Cylinders. Please call Customer Service if you have any questions (p. 3).
9) Ensure the system is deployed to its full length.
Caution:
Systems that are not restored to their full length may not perform to
impact performance standards of MASH.
10) Make all necessary repairs as described above and see the following page for Post-Impact
Instructions.
11) Reset Hit Indicator if necessary.
12) Note the location and condition of the QuadGuard
®
Elite M10 Wide, and any work done,
in your
Impact Attenuator Inspection Logbook
under the date of this inspection. If
further repair is required, note repair request date in logbook. Walk-up inspections are
recommended as needed based upon volume of traffic and impact history. Refer to Post-
Impact Instructions for more information (p. 41).
Figure 43
Mushroom Washer Orientation
26” [660 mm]
LAST
BAY
Figure 42
Distance Across
Minor Axis of ME2 Cylinder
CORRECT
INCORRECT
FENDER PANEL
MUSHROOM
WASHER
STAND-OFF
Содержание QuadGuard Elite M10 Wide
Страница 1: ......
Страница 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Страница 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Страница 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Страница 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Страница 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Страница 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Страница 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Страница 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Страница 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Страница 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Страница 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Страница 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Страница 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Страница 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Страница 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Страница 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Страница 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Страница 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Страница 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Страница 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Страница 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Страница 68: ......