TrinityHighway.com
21
Revision A August 2020
QuadGuard
®
Elite M10 System Chart
Width
8 Bay - 62 mph [100 kph]
69” [1,753 mm]
QM10069E
The nominal width of the
Tension Strut Backup
is the width between Side panels behind the
Backup (Figure 14). The outside width of the system is approximately 6” [152 mm] to 9” [229 mm]
wider than this measurement. The width of the system is not the same as the width of the Backup.
System Assembly
Note:
The Drawing Package supplied with the QuadGuard
®
Elite M10 Wide must be used with
these instructions for proper assembly and should take precedence over these general
instructions.
1) Determine Transition Type with Tension Strut Backup
The QuadGuard
®
Elite M10 Wide uses a Tension Strut Backup.
A Transition Panel or Side Panel must be used on each side of the Backup. A Side Panel is
not needed when a Transition Panel is used. Several types of transitions are available for use
with the QuadGuard
®
Elite M10 Wide.
Figure 14
Width of System with Tension Strut Backup
Figure 15
69” [175
3 mm]
Содержание QuadGuard Elite M10 Wide
Страница 1: ......
Страница 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Страница 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Страница 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Страница 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Страница 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Страница 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Страница 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Страница 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Страница 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Страница 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Страница 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Страница 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Страница 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Страница 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Страница 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Страница 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Страница 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Страница 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Страница 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Страница 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Страница 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Страница 68: ......