TrinityHighway.com
17
Revision A August 2020
4) Apply Approved Adhesive
Fill the borehole 100% full.
Caution:
Fill borehole 100% full so it is even with the pavement surface per the
adhesive manufacturer’s instructions.
5) Add the Washers and Nuts
Place a flat washer onto the stud then thread a nut on until the end of
the stud is flush with the nut (Figure 8).
6) Insert Studs in Boreholes and Wait for Adhesive to Cure
Push the stud down through the part to be anchored and into the
borehole.
Warning:
Do not disturb or load the stud until the approved
adhesive material has fully cured (reference instructions
supplied with the approved adhesive kit).
7) Torque the Nuts
Once the adhesive has fully cured, torque the nut to the adhesive manufacturer’s
recommended values.
Steel Rebar Anchor Assembly Cautions
If steel rebar is encountered while drilling an anchor bolt borehole, apply one of the following
solutions:
A) Use a rebar drill bit for the rebar only and then switch back to the concrete bit to finish
drilling into the underlying concrete until the proper borehole depth is reached.
Caution:
Do not drill through rebar without first obtaining permission to do so
from the project engineer.
B) Drill a new borehole down at an angle past the rebar to the proper depth. Anchor the stud
by completely filling both boreholes with an approved adhesive.
Figure 8
Anchor Application
(Before Applied Torque)
Содержание QuadGuard Elite M10 Wide
Страница 1: ......
Страница 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Страница 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Страница 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Страница 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Страница 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Страница 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Страница 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Страница 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Страница 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Страница 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Страница 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Страница 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Страница 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Страница 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Страница 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Страница 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Страница 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Страница 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Страница 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Страница 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Страница 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Страница 68: ......