Site Preparation/Foundation
A QuadGuard
®
Elite M10 Wide should be assembled only on an existing or freshly placed and
cured concrete foundation (4000 psi [28 MPa] minimum). Location and orientation of the concrete
base and attenuator must comply with project plans or as otherwise determined by the resident
project engineer.
Recommended dimension and reinforcement specifications for new concrete foundations are
provided in Trinity Highway Concrete Foundation drawing, supplied with the system. The system
may be assembled on a non-reinforced concrete roadway (minimum 8” [203 mm] thick). Assembly
cross-slope shall not exceed 8% and should not twist more than 2% over the length of the system;
the foundation surface shall have a light broom finish.
Caution:
Accurate placement of all steel rebar is critical to avoid interference with
the concrete anchor bolts.
Warning:
Location of the Backup in relation to nearby objects will affect the
operation of the attenuator. Upon impact, the Fender Panels telescope rearward
and extend beyond the rigid Backup as much as 25” [635 mm]. Position the Backup
so that the rear ends of the last Fender Panels are a minimum of 25” [635 mm]
forward of objects that would otherwise interfere with movement of the rearmost
Fender Panels. Failure to comply with this requirement is likely to result in system
performance which has not been crash tested pursuant to MASH criteria and may
also cause component damage which will necessitate maintenance or
replacement of the system.
Warning:
It is the responsibility of the installer to ensure proper site grading for
the QuadGuard
®
Elite M10 Wide as directed by the state or specifying agency
pursuant to the AASHTO Roadside Design Guide.
Figure 7
Cross-Slope
8% (5
○
) (12:1)
MAXIMUM
LEVELING PAD
(SHOWN EXAGGERATED FOR
CLARITY)
Содержание QuadGuard Elite M10 Wide
Страница 1: ......
Страница 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Страница 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Страница 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Страница 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Страница 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Страница 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Страница 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Страница 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Страница 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Страница 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Страница 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Страница 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Страница 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Страница 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Страница 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Страница 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Страница 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Страница 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Страница 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Страница 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Страница 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Страница 68: ......