TAC-7X
MANUAL
S
tep 21. Below figures are samples of inspection criteria.
Step 22. Repeat Steps 14 through 19 for each conductor wire gauge to
obtain necessary specimens; inspect per established procedure.
Step 23. After all specimens have been produced, set the power on off
switch to off and open the sleeve valve.
Step 24. If crimps meet all established parameters, certify the TAC-7X for
production use and establish a periodic verification schedule.
3. Periodic Crimp
Verification
Perform Periodic Crimp Verification in the same manner as the Initial
Crimp Verification. Users may desire to prepare an equipment data
sheet upon which "G" and "T' and pull-test results can be recorded.
Содержание TAC-7AE
Страница 6: ...Figure 1 1 TAC 7X Front View ...
Страница 8: ... Figure 1 2 Wire Insertion Through Funnel ...
Страница 12: ...Figure2 1 Pneumatic Hook Up ...
Страница 14: ... Fiqure 2 4 Track Drop Tube Escapement ESCAPEMENT SYSTEM _ _ _ BR ASSEMBL I TRA ...
Страница 18: ... ARBOR COVER PLA TE REMOVED Figure 3 1 Crimp Cylinder Arbor Open ...
Страница 20: ... ARBOR COVER PLAT E REMOVED Figure 3 2 Crimp Cylinder Arbor Closed ...
Страница 23: ... Crimp Inspection Points Improper Crimps ...
Страница 33: ...Figure 6 1 TAC 7X Components ...
Страница 34: ...Figure 6 2 Control Box Components Figure 6 2 TAC 7X Components Right View ...
Страница 35: ...PLC Controller Switching Power Supply Vibratory Feed Controller Figure 6 3 TAC 7X Components Left View ...
Страница 37: ...Figure 6 3 Contact Track Feed Air Adjustments ...
Страница 42: ... Figure 6 4 Indenter Plate Removal ...
Страница 43: ...HOSE CLAMP CAREFULL Y REMOVE Figure 6 5 Indenter Replacement ...
Страница 47: ...Figure 6 6 Indenter Adjustment ...
Страница 52: ...TAC 7X Pneumatic Diagram ...