Network Diagram
Configuration Procedure
Configure Switch A
Steps Operation
Note
1
Configure the
interface and
its IP address.
On page
Routing
→
Interface
→
Interface Config
, create the
interface VLAN2, and configure its IP address as 192.168.1.1 and
Subnet Mask as 255.255.255.0.
2
Add port to the
interface.
On page
VLAN
→
802.1Q VLAN
→
VLAN Config
, add the port
connected to the client to interface VLAN 2.
3
Create the
VRRP group
On page
Routing
→
VRRP
→
Basic Config
, create a VRRP group with
the VRID as 1, the interface as VLAN 2 and the Virtual IP as
192.168.1.10.
4
Configure
VRRP priority
On page
Routing
→
VRRP
→
Advanced Config
, configure the VRRP
priority of interface VLAN 2 as 110.
Configure Switch B
Steps Operation
Note
1
Configure the
interface and
its IP address.
On page
Routing
→
Interface
→
Interface Config
, create the
interface VLAN2, and configure its IP address as 192.168.1.2 and
Subnet Mask as 255.255.255.0.
2
Add port to the
interface.
On page
VLAN
→
802.1Q VLAN
→
VLAN Config
, add the port
connected to the client to interface VLAN 2.
3
Create the
VRRP group
On page
Routing
→
VRRP
→
Basic Config
, create a VRRP group with
the VRID as 1, the interface as VLAN 2 and the Virtual IP as
192.168.1.10.
253
Содержание T3700G-28TQ
Страница 1: ...User Guide T3700G 28TQ T3700G 52TQ 1910012358 REV3 0 0 November 2018...
Страница 11: ...XI...