25
Finishing the Installation
Parts needed for this procedure:
2
Retainer fork
2
Straight hose barb
1
Bulkhead fitting
1
Test beaker
Procedure
1. Locate the two retainer forks, two straight hose barb
fittings, bulkhead fitting and test beaker. Retain
these loose parts for operational testing. Refer to
the Compliance Kit
Operator’s Manual
for more
information.
2. Read the
Operator’s Manuals
for the Multi-Pro 1250
and this Compliance Kit.
3. Test the installed hoses and connections for leaks.
A. Fill the main tank with 50 gallons of clean water.
B. Spray approximately 30 gallons through the
boom system; refer to the Multi-Pro 1250
Operator’s Manual
. Check hose connections for
leaks.
C. Spray approximately 10 gallons through the
spray gun; refer to the Compliance Kit
Operator’s
Manual
. Check hose connections for leaks.
D. Use the remaining water to cycle through
the rinse system; refer to the Compliance Kit
Operator’s Manual
. Check hose connections for
leaks.
E. Drain the remaining water from the main tank
refer to the Multi-Pro 1250
Operator’s Manual
.
Check hose connections for leaks.
4. Check all hose connections for leaks.
28