56
FULLY BIOLOGICAL MINI SEWAGE TREATMENT PLANT FOR YACHTS, HOUSEBOATS AND MOBILE HOMES
enteron | User Manual
CONTROL OF CLEANING PERFORMANCE AND PLANT FUNCTION
To change the radiator, the system must be switched off briefly so that the the
UVC light does not switch on accidentally. Do not - under any circumstances! -
look into the lamp when it is switched on and never remove the protective cap
when the system is switched on. The UVC light is harmful to health, especially
to the eyes.
Unless other regulations have been adopted by state authorities, the cleaning performance of the plant must be
checked at the following intervals:
• daily
Visual inspection of the transparent pipes for blockages
• daily
check the LCD display of the control unit for error messages (these are in-
dicated on the remote-control display by flashing or continuously lightning of the
RESET button)
• daily
visual inspection of the plant for leaks
• weekly
manual pump out of all three tanks to avoid sludge after display mes-
sage
• monthly
adding the bacterial concentrate after display message
• annual
inspection of all plant components and hose connections for tight fit and
leaks, opening of the inspection cover and check of sludge formation
• annual
changing the filter element, shorter intervals in case of blockages and
pumping problems
• Change the UVC lamp when the display shows red colour - carefully pull the cable
connection backwards and remove the lamp. The new lamp must never be touched
with bare fingers; to change it, do not remove the cardboard protective tube until the
plug-in connection has been made; Then plug in the spotlight immediately.