FULLY BIOLOGICAL MINI SEWAGE TREATMENT PLANT FOR YACHTS, HOUSEBOATS AND MOBILE HOMES
enteron | User Manual
It is usually not necessary to change the system time, unless you are on a trip with
changing time zones. Then the time of the system‘s internal night shutdown is
gradually shifted to the time of day, and readjustment should be carried out in all
2 hour time zones.
If all connections have been made correctly and the
system is half full of water, it can be started by swit-
ching on the supply voltage. The correct system startup
is indicated by the initial screen and
[AIR on]
(ventila-
tion pump starts). Pay attention to the fixed inspection
covers. After that, pump once at the remote control
via
[MA MAC]
and pump once via
[MA OUT]
.
SWITCH ON THE PLANT AND TEST RUN
A fully biological sewage treatment plant requires 4-6 weeks of continuous ope-
ration until the correct cleaning performance is achieved. The formation of the
bacterial strain and growing up on the bacterial carriers in the bioreactor takes
time. Nevertheless, the treatment plant meets the standard for sediment free,
disinfected water from the beginning, but there may still be discolouration until it
starts working properly.
You can accelerate this start-up phase by getting bulking sludge from a sewage
treatment plant or another biological treatment plant. This can be put directly
into the toilet in a simple canister (5 l is sufficient). The bacteria contained therein
are already fully formed and prepared for faeces processing. However, the sludge
is only durable for a short time and should be supplied to the plant within 2 hours.
Then rinse several times with water in the toilet and
check the tightness of the hose connections. As long
as all connections are tight, the system can be put into
operation. Add two bags of bacterial concentrate to the
toilet and wait until it dissolves. Then just flush it down,
finished.